Click here to make tpub.com your Home Page

Page Title: FIGURE 43. Trailer supply valve location
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 41. Installing front couplings
Up
MWO-9-2320-287-35 Truck Tractor Commercial Heavy Equipment Transporter (C-HET) 85 000 GVWR 8x6 M911 Installation Instructions for Tow Kit P/N 16306-RU Manual
Next
Figure 44. Connecting trucks for towing

MWO 9-2320-287-35
dm.
Start the engine per TM 9-2320-270-10.
dn.
Push in the trailer air supply control (20).
Figure 43.
T r a i l e r supply valve location
do.
Apply soap solution on all new fittings and hose connections.
dp.
If air is leaking from any fitting or hose connection, turn the engine off,
drain air system, tighten loose fittings or hose connections and repeat steps dm
through do.
OPERATIONAL CHECK
dq.  Hook up tow bar (1) to the rear of the towing truck (2), and to the front of
the truck (3) to be towed.
dr. Hook one end of the red hose assembly (4) to gladhand (5) and the other end
to gladhand (6).
ds. Hook one end of the blue hose assembly (7) to gladhand (8) and the other end
to gladhand (9).
33

Privacy Statement - Press Release - Copyright Information. - Contact Us