Click here to make tpub.com your Home Page

Page Title: MODIFICATON PROCEDURES. (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
MODIFICATON PROCEDURES. (cont)
Up
MWO-9-2320-273-20-1 Truck Tractor Line Haul 50 000 GVWR 6 x 4 M915 Truc k Tractor Light Equipment Transporter (LET) 56 000 GVWR 6x6 W/Winch M916 Manual
Next
MODIFICATON PROCEDURES. (cont)

MWO 9-2320-273-20-1
(10) Install 12357127 support bracket to right frame rail and secure with two MS90725-61 screws,
MS27183-14 washers, and MS51943-5 nuts as shown in figure 6. Tighten nuts finger tight.
(11) Install screw (removed instep 9) through support bracket and right frame rail and secure
with nut (removed in step 9) as shown in figure 6. Tighten nut finger tight.
(12) Tighten two screws installed in step (10) to 20 lb ft (40.7 N.m).
(13) Tighten screw installed in step (11) to 95 lb ft (128.8 N.m).
FIGURE 6
9

Privacy Statement - Press Release - Copyright Information. - Contact Us