Click here to make tpub.com your Home Page

Page Title: Impact Valve and Manifold Replacement
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Installation.
Up
TM-5-3820-239-15 Drill Pneumatic Drifter: Boom-Type; Crawler-Mounted; Self-Propelled (Ingersoll-Rand Models CM150A/D475A and CM225/D475A) Manual
Next
Feed Motor Hoses and Fittings Replacement

7-2.
Impact Valve and Manifold
Replacement
a. Removal.
(1) Remove two screws (1). Remove impact valve
(2) from manifold (3).
(2) Remove two O-rings (4) from impact valve (2)
or manifold (3). Discard O-rings.
(3) Tag and disconnect hose (5) from manifold (3).
b. Installation.
(1) Wrap threads on plug (12) with antiseize tape.
(4) Tag and disconnect hose (6) from swivel (7).
Install plug in manifold (3).
(5) Remove swivel (7) from manifold (3).
(2) Install manifold (3) on bracket (11) using two
(6) Remove two nuts (8), lockwashers(9), and bolts
bolts (10), new lockwashers (9), and nuts (8).
(10). Remove manifold (3) from bracket (11). Discard lock-
(3) Wrap male threads on swivel (7) with antiseize
washers.
tape. Install swivel in manifold (3).
(7) Remove plug (12) from manifold (3).
(4) Connect hose (6) to swivel (7). Remove tag.
(5) Connect hose (5) to manifold (3). Remove tag.
(6) Install two new O-rings (4) in impact valve (2).
(7) Install impact valve (2) on manifold (3) using
two screws (1).
9

Privacy Statement - Press Release - Copyright Information. - Contact Us