Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 4-26. Output Shaft Replacement
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
4-25.  Driven Sprocket Replacement
Up
TM-5-2590-512-13P Earth Auger Assembly Model 1650EH-MS Manual
Next
4-27.  Shaft Bearing Adjustment

TM 5-2590-512-13&P SECTION V.  UNIT MAINTENANCE PROCEDURE 4-26.  Output Shaft Replacement. This task covers: a.  Removal b.  Installation Initial Setup Tools: Equipment Conditions: General Mechanic's Tool Kit Chain Removed (para 4-20). 5180-00-177-7033. Materials and Parts: None. a.  Removal. 1. Straighten tangs on lock washer (1). 2. Remove  lock  nut  (2)  and  lock  washer  (1). Use spanner wrench. 3. Carefully slide off driven sprocket (3) along with shaft key (4) from output shaft (5). NOTE Use   care   in   removing   sprocket   to avoid damage to shaft threads. 4. Slide   output   shaft   (5)   out   thru   bottom   of Auger Drive Unit housing (7). 5. Remove    spacer    (6)    positioned    between sprocket   (3)   and   bearing   (9)   and   nestled inside of shaft seal (8). b.  Installation. 1. Carefully slide output shaft (5) into opening in  bottom  of  Auger  Drive  Unit  housing  (7). Check   that   it   rotates,   without   binding,   on hub bearings (9,10). 2. Place spacer (6) on output shaft (5) so it fits snugly inside of upper shaft seal (8) and on top race of bearing (9). 3. Install shaft key (4) in slot in output shaft (5) and slide driven sprocket (3) (with hub side up)   onto   shaft   (5).      Use   care   to   avoid damaging shaft threads. 4. Install    lock    washer    (1)    and    lock    nut (2).Finger tighten lock nut (2).  Do not bend tangs on lock washer (1) at this time. FOLLOW ON TASKS: Shaft Bearing Adjustment (see para 4-27) Install Chain (see para.  4-20). END OF TASK. NOTE Items 8, 9, and 10 are in place inside hub. 4-27

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing