Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION V. UNIT MAINTENANCE PROCEDURE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
SECTION V.  UNIT MAINTENANCE PROCEDURE
Up
TM-5-2590-512-13P Earth Auger Assembly Model 1650EH-MS Manual
Next
4-23  Motor Plate Replacement

TM 5-2590-512-13&P SECTION V.  UNIT MAINTENANCE PROCEDURE 4-22 Motor Sprocket Replacement. This task covers: a.  Removal. b.  Installation. Initial Setup Tools: Equipment Conditions: General Mechanic's Tool Kit Chain removed (see para.  4-20). 5180-00-177-7033 Materials and Parts: Lock washer. Rags. GAA Grease. a.  Removal. 1. Remove    bolt    (1),    lock    washer    (2),    flat washers  (3),  and  spacer  (4)  from  hydraulic motor shaft (5). 2. Slide  motor  sprocket  (6),  and  shaft  key  (7) off from shaft of hydraulic motor (5). b.  Installation. 1. Remove  rust,  dirt,  etc.    and  lightly  grease shaft of hydraulic motor (5). NOTE Disregard alien head set screw which may be in some sprockets. 2. Slide  motor  sprocket  (6)  and  shaft  key  (7) onto motor shaft (5).  Do not force. 3. Install   bolt   (1),   new   lock   washer   (2),   flat washer (3) and spacer (4).  Torque to 180 to 250 Ib. ft. FOLLOW ON TASKS: Install chain (see para 4-20). END OF TASK 4-23

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing