Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION V. UNIT MAINTENANCE PROCEDURE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
SECTION V.  UNIT MAINTENANCE PROCEDURE
Up
TM-5-2590-512-13P Earth Auger Assembly Model 1650EH-MS Manual
Next
SECTION V.  UNIT MAINTENANCE PROCEDURE

TM 5-2590-512-13&P SECTION V.  UNIT MAINTENANCE PROCEDURE 4-20 Chain Replacement. This task covers:   a.  Removal. b.  Installation. Initial Setup Tools: Equipment Conditions: General Mechanic's Tool Kit Hydraulic System Depressurized 5180-00-177-7033. Front safety cover removed (para.  4-17). Rear safety cover removed (para.  4-18) Materials and Parts: Rags. a.  Removal 1. Disconnect   two   hydraulic   hoses   at   quick disconnect fittings (1) at top of Auger Drive Unit (2).  Use rag to catch fluid drippings. 2. Rotate  chain  (3)  so  that  chain  master  link (4)  is  located  between  chain  sprockets  as shown.    (Move  chain  by  inserting  leverage bar in opening in auger drive unit hex shaft (5) and turning). NOTE If  resistance  is  felt  when  attempting to  turn  shaft,  have  assistant  relieve residual    hydraulic    pressure    inside Auger   Drive   Unit   by   holding   open quick disconnect fittings (1). 3. Loosen  four  nuts  (6),  two  lock  up  nuts  (7), two adjusting rod bolts (8), until motor plate (9)  is  free  to  slide.    Move  motor  plate  (9) until chain (3) is loose. 4. Remove spring lock (10), keeper (11), from master   link   (4).      Slide   lower   section   of master  link  (4)  down  and  out  of  adjacent links. 5. Remove chain. b.  Installation. 1. Thread replacement chain around drive sprocket (12), allowing both ends of chain to meet on motor sprocket (13). 2. Insert lower master link (4), through ends of drive chain (3).  Install keeper (11). 3. Install master link spring lock (10) (widest opening) over one post of master link (4) lower half.  Then slide spring lock (10) over other post until seated into locked position. FOLLOW ON TASKS: Chain adjustment (see para 4-19). Install front and rear safety covers (see para.  4-17 and 4-18). Connect hydraulic hoses at quick disconnect fittings (1).  Use rag to wipe up drippings and clean connections. END OF TASK. 4-21

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing