Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 4-15. PREPARATION FOR BUCKET USE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
b.  Attach Auger Drive Unit
Up
TM-5-2590-512-13P Earth Auger Assembly Model 1650EH-MS Manual
Next
c.  Remove Auger Drive Unit

TM 5-2590-512-13&P d.  Installing Auger 138 Inch Hoses 1. Grease short shaft on hose hanger bracket (8) with GAA grease. 2. Install 138 inch hose assembly (10) by placing hose  hanger  clamp  (7)  on  short  shaft  of  hose hanger    bracket    (8).        Install    lynch    pin    (9) download   thru   hole   in   short   shaft   on   hose hangar bracket (8).  Pivot lynch pin ring (9) into locking position. 3. Connect 138 inch hoses (10) at bucket control cylinder hose disconnects (11). 4. Connect  138  Inch  hoses  at  Auger  Drive  Unit quick disconnects (12). 5. Check   for   loose   or   open   or   open   fittings. Replace     any     hydraulic     fluid     lost     during installation. NOTE Auger will be installed at evacuation site 4-15.  PREPARATION FOR BUCKET USE NOTE This  procedure  may  also  be  performed by the operator at the excavation site. a.  Removing Auger 138 Inch Hoses. 1. Disconnect   138   inch   hoses   (10)   at   quick- disconnects from bucket control cylinder hoses (11).    Use  rags  to  keep  fittings  clean.    Install protective dust cap and plugs. 2. Disconnect    other    end    of    138    inch    hose assembly   (10)   from   quick   disconnect   fittings (12)  at  Auger  Drive  Unit  (13).      Use  rags  to keep  fittings  clean.    Install  protective  dust  cap and plugs. 3. Unlock   and   remove   tethered   lynch   pin   (9) holding  hose  hangar  clamp(7)  on  hose  hangar bracket  (8).    Remove  hose  hangar  clamp  (7) with hoses attached.  Store and lock lynch pin downward    in    short    shaft    on    hose    hangar bracket (8).  Coil hoses up for storage. b.  Installing Bucket Control Hoses. 1. Remove two nuts (14) at hose clamp (15) and remove the top half of clamp (15). 2. Remove and disconnect coupled bucket control cylinder hoses at quick fitting (18). 3. Install  top  half  of  hose  clamp  (15)  and  nuts (14).    Tighten  nuts  (14)  to  3-5  lb.      Ft.      (4-7 N.m). 4. Connect  bucket  control  cylinder  hoses  (16)  to hoses  (17)  coming  from  rear  of  SEE  at  quick disconnect (11). NOTE Before   starting   SEE   engine   check   for loose  or  unconnected  hoses  and  loose fittings.  Also check hydraulic fluid level in  SEE  reservoir  and  replace  hydraulic fluid lost when hoses were installed. 4-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing