Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: c. Verify Hose Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
b.  Kit Installation
Up
TM-5-2590-512-13P Earth Auger Assembly Model 1650EH-MS Manual
Next
5. Install two spiral hose clamps

TM 5-2590-512-13&P 9. Seat hose (14) male quick disconnect fitting into female quick disconnect fitting (12). 10.  Seat  hose  female  quick  disconnect  fitting (8) into male quick disconnect fitting (6). 11.  Position  upper  end  of  hoses  so  that  they cross  beyond  clamp  (4)  and  under  boom elbow (15). 12.  Remove top half of tube clamp (4). 13.  Position 30 inch hoses over open clamp (4). Install  DOM  spacer  (16),  top  half  of  clamp (4), lock washer (17), bolt (18), and tighten. c.  Verify Hose Installation. 1. When hoses are installed correctly, 30 inch hose (8) (with female quick disconnect), will be positioned along Driver Side of boom. 2. 30 inch hose(14) (with male quick disconnect), will be positioned along curbside of boom. 3. Hoses   will   crossover   after   clamp   (4)   and under boom elbow (15). 4. Hoses  are positioned in clamps (3) and (4) so  they  do  not  stretch  or  bind  when  dipper or boom is moved throughout its range. NOTE If  hoses  are  not  crossed  bucket  and auger controls will operate reverse of what is expected. Layout of Metal Rigid Tubing Prior to Kit Installation. Layout of Hoses and Connections after Kit Installation. 4-10

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing