Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-7. TABLE OF OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
CLASS III Leakage of fluid great enough to form drops that fall from item being inspected
Up
TM-5-2590-512-13P Earth Auger Assembly Model 1650EH-MS Manual
Next
TABLE OF OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) -CONT

TM 5-2590-512-13&P 2-7.  TABLE OF OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) Item Item to be Procedure Not Fully Mission No. Interval Checked or Capable If: Service 1. Before Earth Auger Assembly Check that Auger Drive Unit thru Pins are bent or Mounting at Connecting Connecting Link is mounted to SEE bind in place. Link. dipper and is secured in place by link pin.  Check that oblong head of link pin is seated against pin stop. Check that lynch pin is installed thru Either pin worn, end hole in link pin and is in locked elongated holes in position. connecting link. Check that cotter pin is installed thru Cotter pin end hole of unit clevis pin and is in missing, end locked position. broken off, ends not spread. Check Connecting Link for bent Rust thru. parts, enlongated pin holes, rust damage to pipe or defective welds. 2-5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing