Click here to make tpub.com your Home Page

Page Title: Chapter 4: SHIPMENT, ADMINISTRATIVE STORAGE, AND DEMOLITION TO PREVENT ENEMY USE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 3-12. Pile contours fitting driving head.
Up
TM-5-3895-265-14 Hammer Pile Driver Self Powered; Diesel Driven W/Fuel Oil Tank and Lubricating Oil Tank (Link-Belt Speeder Model 180M) Manual
Next
Other Demolition Methods

CHAPTER 4
SHIPMENT, ADMINISTRATIVE STORAGE, AND
DEMOLITION TO PREVENT ENEMY USE
Section I. SHIPMENT AND ADMINISTRATIVE STORAGE
d. Packing. Pack the disassembled components,
4-1. Preparation of Equipment for Shipment
basic issue items, and publications in a suitable
a. General. Instructions for preparation of the
container, and secure to the hammer. Refer to
hammer for domestic shipment are provided in
TM 38-230 for guidance in selection, fabrication
this paragraph.  Preservation and packaging
and packing of the container.
shall be accomplished in a sequence that will not
e. Marking. Mark in accordance with MIL-
require the operation of previously preserved
components.
STD-129.
f. Loading. Load, block, brace, and tie-down
b. Inspection. Examine the hammer for any
hammer in accordance with carrier rules and
unusual condition such as damage, rusting, ac-
regulations.
cumulation of water and/or missing components.
Make a complete inspection of the hammer as
4-2. Administrative Storage
outlined in the Preventive Maintenance Checks
and Services, paragraph 3-6.
Preparation, care, and removal of equipment in
c. Preservation. Clean, paint, preserve and
administrative storage will be in acordance with
the applicable requirements of TM 740-90-1
weather-proof in accordance with applicable re-
(Administrative Storage of Equipment).
quirements of TM 740-90-1.
Section II. DEMOLITION OF HAMMER TO PREVENT ENEMY USE
4-5. General
(3) Remove the transmitter.
When capture or abandonment of the diesel pile
(4) Remove the starting device.
hammer is imminent, the responsible unit com-
(5) Engage lifting mechanism while ham-
mander must make the decision to either destroy
mer is running and continue to run hammer.
the equipment or render it inoperative. Based on
b. Demolition by Mechanical Means. Use a
this decision orders are issued which cover the
sledge hammer, crowbar, picks, axes, or other
desired extent of destruction. Whatever method
heavy tools to damage the fuel and lube pumps,
of demolition is employed, it is essential to de-
the injector assembly and the starting device.
stroy the same vital parts of all the hammers and
all corresponding repair parts.
4-7. Demolition by Explosives or
4-6. Demolition to Render the
Weapon's Fire
Equipment Inoperative
a. Demolition by Explosives. Place the follow-
a. Demolition by Misuse.
ing charges and detonate them simultaneously
with a detonating cord and a suitable detonator.
(1) Throw sand, dirt and small pieces of
Refer to figure 4-1.
metal in intake, exhaust, and vent ports and oper-
ate hammer.
(1) Two ½ pound charges on fuel and lube
tank.
(2) Remove the injector assembly.
4-1

Privacy Statement - Press Release - Copyright Information. - Contact Us