Click here to make tpub.com your Home Page

Page Title: Chapter 2: INSTALLATION AND OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Differences in Models
Up
TM-5-3895-265-14 Hammer Pile Driver Self Powered; Diesel Driven W/Fuel Oil Tank and Lubricating Oil Tank (Link-Belt Speeder Model 180M) Manual
Next
Figure 2-1. Separately packed components.

CHAPTER 2
INSTALLATION AND OPERATING INSTRUCTIONS
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
2-1. Inspecting and Servicing the
services (table 3-1). Correct or report deficien-
Equipment
cies to direct support maintenance personnel.
a. Inspect identification plates of the hammer
2-2. Installation of Separately Packed
and compare with data contained in invoices, or
Components
packing slips, to insure receipt of proper equip-
ment.
a. The hammer is delivered with the hydraulic
b. Make a complete visual inspection of the
control system, driving head and adapter, and
equipment for any loss or damage that may have
guide angles packed separately. Refer to figure
occurred during shipment. Prior to operation of
the hammer, accomplish depreservation as out-
b. Install the hydraulic control system and
lined in DA Form 2258 (Preservation and De-
guide angles as illustrated in figure 2-2. The
preservation Guide for Vehicles and Equipment).
hydraulic control system should be installed after
c. Inspect the entire hammer for loose connec-
the hammer is in the leads. Refer to figure 2-4
tions, broken lines or fittings, tightness of attach-
to install the driving head and adapter assembly.
ments, security of mountings and freedom of
operation of all controls.
2-3. Installation or Setting-Up Instructions
d. Inspect inside of fuel and lubricating tank
a. Attach a hoist line to the lifting eye in the
for presence of water, rust, or foreign matter.
cylinder head (fig. 1­1) and install the hammer
Hammers shipped for immediate use must have
in the leads. Use care not to snag the hydraulic
full tank.
control hose. Assemble the adapter as illustrated
e. Lubricate as specified on lubrication order.
in figure 2-3, and attach the driving head and
Perform daily preventive maintenance checks and
adapter assembly as illustrated in figure 2-4.
2-1

Privacy Statement - Press Release - Copyright Information. - Contact Us