Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: b. Installation.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-364-20-5      18-21 b. Installation. Wear heavy gloves when handling crane cable.  Never let cable run through hands; frayed cable can cut. (1) Lay cable (2) out on level surface and remove loops. (2) With the aid of an assistant, feed cable (2) over sheave pulley (5) and thread through hoist drum (4) from inside to outside of reel. (3) Feed cable (2) up through retainer (3) and loop back around. (4) Position wedge (1) inside looped cable (2).  Tighten cable around wedge until 1 in. (25.4 mm) of cable extends out of retainer (3). c. Follow-On Maintenance: Install hook block and clevis, (Para 18-8). Reel in hoist cable, (TM 9-2320-364-10). Load test crane, (TM 9-2320-364-34). Remove wheel chocks, (TM 9-2320-364-10). END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business