TM 10-3930-664-24 C. INSPECTION Inspect     priority     valve     and     related     components     in accordance with paragraph 1-24. D. INSTALLATION 1. Install  elbows  (6,  7,  8,  9,  10)  and  new  O-rings  (11, 12,   13)   into   priority   valve   (14).         Ensure   proper orientation of elbows. 2. Install priority valve (14) onto mounting plate  bracket (15)    using    screws    (16),  grommets  (17),  and  nuts (18). 3. Connect   five   hose   assemblies   (1,   2,   3,   4,   5)   to priority valve elbows (6, 7, 8, 9, 10). FOLLOW-ON MAINTENANCE: Service hydraulic oil in accordance with Lubrication Order END OF TASK 2-329

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business