TM  10-3930-638-24&P 4-2.   ENGINE   MAINTENANCE   (cont) g. Camshaft and Bearings. This  task  covers  replacement  of  the  camshaft  and  bearings  consisting  of: a.  Removal b. Disassembly c.  Cleaning INITIAL   SETUP TOOLS Metal Rod, 1/2 inch diameter by 4 feet long Clothespins Wooden Dowels, 3/8 inch diameter by 12 inches long (eight  required) Micrometer, zero to 5 inches Bore Gage, zero to 5 inches Asbestos  Gloves Dial  Indicator Gear and Bearing Heater No. 1 Common Organiza- NSN  4910-00-754-0654 tional  Maintenance  Tool  Kit SPECIAL   TOOLS Camshaft  Bushing  Tool  Kit FSCM 10988 P/NA41 103 MATERIALS/PARTS Cleaning  solvent  P-D-680 Clean  cloths Oil, No. 30 d. Inspection and e.  Reassembly f.  Installation EQUIPMENT   CONDITION Paragraph Condition Description 2-14e Exhaust  manifold  removed. 2-17e Water  pump  removed. 3-6a Fuel injector fittings disconnected. 3-5j Rocker  arm  assembly  removed. 3-5f Tachometer drive removed. 3-5k Oil  pan  removed. 4-2h Timing  gear  cover  removed. 4-2e Flywheel and flywheel housing removed. 4-2d Crankshaft  removed. KEY 1.  Thrust  plate bolts 2. Lock washers 3. Valve tappet 4. Camshaft nut 5. Lock 6.  Camshaft  gear 7. Key 8. Camshaft thrust plate 9. Camshaft 10. Front camshaft bushing 11.  Center  and intermediate camshaft bushings 12. Rear camshaft bushing 13. Cup plug 14. Push rods Repair 4-52

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business