|
| |
Back Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) for M917A1 and M917A1 w/MCS Body (Con't) | Up TM-5-3805-264-14P Truck Dump Heavy Body M917A1 and M917A1 W/MCS (Material Control System) Manual | Next Section III. OPERATION UNDER USUAL CONDITIONSSection III. OPERATION UNDER USUAL CONDITIONS |
TM 5-3805-264-14&P
Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) for M917A1 and M917A1
w/MCS Body (Con't).
Item
No.
21
Location
Item To
Check/
Interval
Service
Monthly
Tailgate
Locking
Linkage
22
Monthly
2-24
Procedure
a. Apply grease (Item 10, Appendix F)
to tailgate locking linkage grease fit-
ting (36).
Not Fully Mission
Capable If:
Tailgate
Hinge Pins
b. Remove body props and lower dump
body (paragraph 2-15).
Apply grease (Item 10, Appendix F) to
each tailgate hinge pin grease fitting
(37).
|