|
| |
- TECHNICAL MANUAL
- WARNING
- Operator and Organizational
Maintenance Manual
- Appendix C: BASIC ISSUE
ITEM LIST AND ITEMS
- Table of Contents
- List of Illustrations
- List of Illustrations
(Cont)
- Chapter 1. INTRODUCTION
- Portable crushing and
screening plant.
- Figure 1-1. Crushing and
screening unit, left side.
- Figure 1-2. Crushing and
screening unit, right side.
- Figure 1-3. Wiring diagram.
- Chapter 2. OPERATING
INSTRUCTIONS
- Installation
- Figure 2-3. Stabilizing
jack positions
- Equipment Conversion
- Table 2-1. Roll Crusher
Estimated Product Gradation Chart Guide A Open CircuitQ
- Section II. MOVEMENT TOA
NEW WORKSITE
- Figure 2-4. Folding side
conveyors.
- Rock and Sand Conveyor
- Figure 2-5. Rock and sand
conveyor, removal and installation (sheet 2 of 3).
- Figure 2-5. Rock and sand
conveyor, removal and installation (sheet 3 of 3).
- Power Unit
- Figure 2-7. Overhead
conveyor, removal and installation sheet (1 of 2).
- Figure 2-7. Overhead
conveyor, removal and installation sheet (2 of 2).
- Elevating Wheel Assembly
- Figure 2-8. Elevating wheel
assembly, removal and installation.
- Figure 2-9. Walkway and
ladder,removal and installation
- Dolly
- Figure 2-11. Dolly air
brake hook up, to prime mover.
- Reinstallation After
Movement
- Controls and Instruments
- Figure 2-16. Controls and
instruments.
- Section IV. OPERATION UNDER
USUAL CONDITIONS
- Stopping
- Section V. OPERATION UNDER
UNUSUAL CONDITIONS
- Operation in Extreme Heat
- Chapter 3. OPERATOR'S
MAINTENANCE INSTRUCTIONS
- Section IV. TROUBLESHOOTING
- Section V. MAINTENANCE OF
CRUSHING AND SCREENING UNIT
- Figure 3-1. Secondary and
primary fuel filter element, removal and replacement.
- Primary Fuel Filter Element
- Figure 3-2. Lubricating oil
filter service.
- By-Pass Oil Filter Element
- Batteries
- Figure 3-4. Air cleaner
service.
- Fuel Tank
- Eccentric Shaft
- Figure 3-8. Screens and
frame, removal and installation.
- Inspection.
- Figure 3-8. Screens and
frame, removal and installation.
- Table 3-3. V-Belt
Deflection.
- Hopper Flop Gate
- Figure 3-11. Flop gate
handle.
- Chapter 4. ORGANIZATIONAL
MAINTENANCE INSTRUCTIONS
- Table 4-1. Preventive
Maintenance Checks and Services
- Section VI. TROUBLESHOOTING
- Figure 4-1. Radio
suppression components.
- Section VIII. MAINTENANCE
OF ROLL CRUSHER UNIT
- Figure 4-3. Fuel injector,
removal and installation.
- Exhaust Valve Clearance
Adjustment
- Primary and Secondary Fuel
Filter
- Fuel Tank, Lines and
Fittings
- Starting Aid
- Air Cleaner
- Lubrication System
- Oil Cooler
- By-Pass Lubricating Oil
Filter
- Thermostat
- Water Tubes, Hoses and
Fittings
- Engine Controls
- Fuel Pressure Switch
- Water Temperature Switch
- Sending Units
- Electrical System
- Figure 4-24. Generator
regulator, removal and installation.
- Starting Motor
- Figure 4-26. Starting
motor, removal and installation.
- Exhaust System
- Figure 4-29. Muffler and
pipe, removal and installation.
- Side Panels and Hood
- Figure 4-30. Side panels
and hood, removal and installation.
- Figure 4-31. Side panels
and hood assembly, exploded view
- Power Take-off Clutch
Adjustment
- Clutch Controls-Power
Take-Off
- Figure 4-36. Conveyor belt
cutting.
- Figure 4-38. Conveyor belt
fastener installation.
- Belt Tension Adjustment
- Figure 4-40. Conveyor belt
training.
- Belt Wiper
- Conveyor Pulley Lagging
- Figure 4-45. Position
lagging.
- V-Belts.
- V-Belt Adjustment
- Figure 4-50. Screen and
side conveyor countershaft to rock conveyor drive V-belt adjustment.
- Figure 4-52. Flywheel to
elevating wheel and undercrusher.
- Figure 4-53. Power take-off
to main countershaft V-belt adjustment.
- Figure 4-55. Lower
countershaft to adjustable idler drive, V-belt adjustment.
- Clutch Controls
- Screen Drive V-Belt Idler
- Rock Conveyor V-Belt Idler
- Figure 4-61. Rock conveyor
drive idler, removal and installation.
- Roll Crusher Drive V-Belt
Idler
- Figure 4-64. Roll crusher
idler, disassembly and reassembly.
- Elevating Wheel
- Vibrating Screen
- Figure 4-68. Coil spring
adjustment.
- Support Springs
- Compression Spring
Adjustment.
- Size of Feed
- Figure 4-72. Screening
unit, wheel, tire and brake assembly, removal and installation.
- Secondary Screening Unit
Air Brake System
- Reservoir
- V-Belt Guards
- Walkway and Ladder
- Figure 4-77. Walkway and
Iadder, removal and installation.
- Stabilizing Jacks
- Figure 4-79. Stabilizing
jack, removal, disassembly, reassembly and installation.
- Secondary Screening Unit
Lights
- Dolly
- Figure 4-82. Fifth wheel,
removal, disassemble, reassembly and installation.
- Pull Tongue, Safety Chain
and Mud Flap
- Figure 4-83. Dolly wheel,
tire, and brake assembly, removal, d4tnsembly, reassembly and
installations.
- Figure 4-84. Dolly air
brake system, electrical light and wiring harness, removal,
disassembly, reassembly and installation.
- Dolly Electrical Wiring
Harness and Lights
- Appendix A: REFERENCES
- Appendix B: MAINTENANCE
ALLOCATION CHART
- Section II. MAINTENANCE
ALLOCATION CHART
- Section II. MAINTENANCE
ALLOCATION CHART (Cont)
- Section II. MAINTENANCE
ALLOCATION CHART (Cont)
- Section II. MAINTENANCE
ALLOCATION CHART (Cont)
- Appendix C: BASIC ISSUE
ITEMS LIST
- Section II. BASIC ISSUE
ITEMS
- Section III. MAINTENANCE
AND OPERATING SUPPLIES
- ALPHABETICAL INDEX
- ALPHABETICAL INDEX (Cont)
- ALPHABETICAL INDEX (Cont)
- ALPHABETICAL INDEX (Cont)
- THE METRIC SYSTEM AND
EQUIVALENTS
- TM-5-3820-233-12-2
- By Order of the Secretary
of the Army:
- Blank Page
- Recommended Changes to
Equipment Technical Publications
|
|