NOTES - CONTINUED:
10. FAN PULLEY (CRANE ENGINE). Remove plug
17. EXPOSED GEARS/BULL GEAR. Keep exposed
and insert fitting. Lubricate and reinstall plug.
gears and pinions coated with CW in sufficient amount to
keep bright metal from showing.
11. HYDRAULIC OIL FILTER. Each 250 hours, remove
filter element, clean filter shell and install new filter
18. TAGLINE HOUSING. Keep tagline housing 1/2 full
element. After replacement, operate hydraulic system
of GO. Do not overfill.
for 5 minutes, check for leaks, check level and bring to
"FULL" mark.
19. CABLES. Each 5 hours clean and coat all cables
with OE/HDO, except those coming in constant contact
12. HYDRAULIC OIL RESERVOIR. Relieve pressure
with dirt and excavated material.
in reservoir before removing dipstick to check level.
Each 10 hours check level. Maintain oil level at "FULL"
20. LUBRICANTS. The following is a list of lubricants
mark. Each 1000 hours drain hydraulic system, clean fill
with military symbols and applicable specification
cap and oil filter screen. Remove filter element, clean
numbers.
filter shell, and install new filter element. Refill reservoir
with OE/HDO 10, operate hydraulic system for 5
OE/HDO
MIL-L-2104
minutes, check for leaks, check level and bring to
OEA
MIL-L-46167
"FULL" mark.
GO
MIL-L-2105
BFS
MIL-B-46176
13.
FRONT DIFFERENTIAL/REAR DIFFERENTIAL.
GAA
M IL-G-10924
Each 50 hours check level. Change gear lubricant only
(SD), Type II
P-D-680
when required by maintenance repair action,
OAI
MIL-L-6085
CW
VV-L-751
refill, operate for 5 minutes, check for leaks and bring oil
level to fill and level plug opening.
Copy of this Lubrication Order will remain with the
equipment at all times, instructions contained herein are
14.
WHEEL SHAFT UNIVERSAL JOINTS.
Using
mandatory.
outriggers, raise machine. Turn front and rear wheels
full left or right until grease plugs, located in top and
By order of the Secretary of the Army:
bottom of wheel shaft U-joint trunnions, are visible.
Remove plug (2 each wheel) and install fittings.
JOHN A. WICKHAM, JR.
Lubricate and reinstall plugs.
General, United States Army
Chief of Staff
15. WHEEL PLANETARIES. Each 100 hours rotate
wheel until plug is horizontal with center line of axle.
OFFICIAL:
Remove plug, check level and reinstall plug. Change
gear lubricant only when required by maintenance repair
ROBERT M. JOYCE
Major General, United States Army
Rotate wheel until plug is at bottom center, remove plug
The Adjutant General
and drain. Rotate wheel back to level point, fill and
reinstall plug. After refill, operate for 5 minutes, check
DISTRIBUTION:
for leaks, and bring oil level to fill and level plug opening.
To be distributed in accordance with DA Form 12-25B,
16. DRIVE SHAFTS. Remove plug and insert fittings.
Operator and Organizational maintenance requirements
Lubricate and reinstall plug.
for WHEEL MOUNTED CRANE.
TA221962
LO 5-3810-232-12
IU.S. GOVERNMENT PRINTING OFFICE: 1998-432-760/80006
CARD 11 OF 11