Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-5. Screed Lift System Troubleshooting - Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Table 2-5.  Screed Lift System Troubleshooting
Up
TM-5-3895-373-34 Paving Machine Bituminous Material Crawler Mounted Diesel Engine Driven Manual
Next
2. SCREED FAILS TO LOWER

TM 5-3895-373-34 Table 2-5.  Screed Lift System Troubleshooting - Continued. MALFUNCTION TEST OR INSPECTION CORRECTIVE ACTION 1. SCREED FAILS TO LIFT - Continued. WARNING Hydraulic oil can be moderately flammable and can be an irritant to skin, eyes, and respiratory system. Avoid  prolonged  exposure.    Eye  protection  and  rubber  gloves  must  be  worn  when  working  with hydraulic oil. Step 3. Install hydraulic system tester for flow test at outlet (I) per TM 9-4940-468-14.  Check flow at stack valve outlet (1) to return manifold with screed lift switch in lift position. If flow is present, replace or repair valve controlled by electrical coil S13 per paragraph 2.44 or replace stack valve per paragraph 2.55. If no flow is detected, replace or repair valve controlled by electrical coil S12 per paragraph 2.44 or replace stack valve per paragraph 2.55. NOTE The following test requires use of a hydraulic system tester.  Install tester in-line at pressure test point indicated  by  each  individual  test  per  TM  9-4940-468-14.    Make  sure  all  ratings  of  fittings  and  hoses used are adequate for maximum pressures and flows being tested. Step 4. Install hydraulic system tester for pressure test at port (2) per TM 9-4940-468-14.  Check pressure at power-beyond outlet to track tension system at port (2) with screed lift switch in lift position. If pressure is 2500 psi (17 238 kPa) with screed lift switch in lift position, replace power beyond valve per paragraph 2.44 or replace stack valve per paragraph 2.55. Step 5. Disconnect  hydraulic  system  tester  per  TM  9-4940-468-14.    Reconnect  all  hydraulic  lines.    Close right access door per TM 5-3895-373-10. 2-37

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing