Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2.4.3. Checking Unpacked Equipment.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
b. Remove tape securing air cleaner cap assembly
Up
TM-5-3895-373-20 Bituminous Distributor Body M918 Model D-63 Manual
Next
SECTION III. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)

TM 5-3895-373-20 d. Remove pressure gauges (11) from toolbox (12). Remove   protective   bubble   wrap   material   from pressure gauges. e. Pressure  gauges  (11)  shall  be  tagged  "For  Use with  780T  Paving  Machine  only"  and  properly  stored  in the    Organizational    Maintenance    Shop.    Refer    to    TM 53895-373-24P, Special Tools List for gauge identification data. 2.4.3. Checking Unpacked Equipment. a. Inspect    the    equipment    for    damage    incurred during   shipment.   If   the   equipment   has   been damaged, report the damage on SF 364, Report of Discrepancy. b. Check the equipment against the packing slip to see   if    the    shipment    is    complete.    Report    all discrepancies in accordance with the instructions in DA PAM 738-750. 2.4.4. Assembly of Equipment. The paving machine is shipped   assembled   and   ready   for   use.   Installation   of end-gates   is   required   prior   to   paving.   Installation   of paving  accessories  is  required  prior  to  paving  extended widths.  Install  the  end-gates  and  extended-width  paving accessories per instructions in TM 5-3895-373-10. 2-5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing