Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
GENERAL INFORMATION
Up
TM-5-3895-374-24-1 Paving Machine Bituminous Material: Crawler Mounted Diesel Engine Driven Manual
Next
Fig. 1-Drawing showing placement of thermocouple In exhaust duct

TM 5-3895-374-24-1 GP467FB CAUTION If  the  process  system,  such  as  a  rotary  dryer  application,  has  a  fabric  filter  dust  collector  (baghouse), consult the manufacturer for recommended baghouse temperature limitations. See Section G, Example 3 for entering the desired Alarm Setpoint. B.  RECEIVING AND INSPECTION Upon receipt, check each item on the bill of lading and/or invoice to determine that all equipment has been received.  A careful examination should be made to ascertain If there has been any damage in shipment. IMPORTANT For optimum use of the Hauck panel, it Is suggested that the Hauck drawings provided be referred to for recommended switch and valve installation and wiring.  In the event any recommended switch application is  not  utilized,  It  will  be  necessary  to  connect  a  jumper  wire(s)  between  appropriate  terminals  on  the control  panel  or  burner  junction  box,  as  applicable  Such  determination  remains  the  responsibility  of  the customer,  based  upon  his  application,  accepted  safe  installation  and  operating  procedures,  and  any applicable governmental regulations. C.  INSTALLATION 1. Locate the panel on a firm support in an area which is protected from the weather and free of vibration. IMPORTANT The   operating   specification   of   32-142   deg   F.,   595%   relative   humidity,   noncondensing,   should   be considered in selecting the location for the panel. 2. Provide 120 Vac single phase GROUNDED NEUTRAL power to the burner control panel.  It is recommended that the customer provide and install a master disconnect switch to interrupt power service to the panel.  Maintain polarity as Indicated on the drawings provided when wiring the main power source to the panel. 3. Install a Heavy gauge (No.  12 AWG minimum) ground wire between the panel ground terminal and "Earth" ground. Install  and  wire  the  burner  and  system  limit  switches,  fuel  valves,  flame  scanners,  ignition  transformer,  and  other associated components as shown in the drawing provided.  SEE THE CAUTION above pertaining to certain aggregate drying applications. 4. Install  the  Hauck  stack  temperature  thermocouple,  as  applicable,  in  the  dryer  exhaust  duct  to  sense  exhaust  gas temperatures.  Install the thermocouple as detailed In figure 1. (page 3-8)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing