Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Cleaning Site
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   

 

Back
Cleanout Cover and Frame
Up
Steelworker Volume 02 - Building manual for how to work with steel
Next
Chapter 10 Pontoons

the frame in place. Install the frame with the radiused flanges  over  the  bolts  with  the  flange  against  the outside of the stave. As the frame straddles a lap seam, make sure a wedge gasket is under the gasket at the seam. Work the bolts through the bottom flange of the frame.  Install  the  nuts  temporarily  or  enough  bolts  to hold  the  frame  in  place. Install the gasket and the washer with the cup side down over the gasket on all of the seam bolts. Omit the gaskets and the washers on the chime bolts. Apply the nuts with a rounded face down on all of the bolts. Tighten them uniformly around the frame to maintain a  leakproof  joint. CLEANOUT  COVER—  Work  from  the  back and  insert  1/2-  by  1-inch  bolts  through  the  front flanges of the frame. Install the gasket along the full length of each row of bolts in the top and the bottom flanges. Allow a one bolt overlap at each end. Install the gasket along the full length of each row of bolts in the side flanges. Press the gaskets over the top and the bottom flange gaskets. Allow a one bolt hole overlap ate each end. Apply a heavy coating of sealing compound at the overlap of the top and the side flange gaskets. Stand the cover (fig. 9-25, #6) in position with plates #7 and #8 set for direct reading, and slip the cover over the bolts. Install the gasket and the washer with the cup side down over the gasket on all of the bolts. Apply the nuts with a rounded face down on all of the bolts. Tighten  the  bolts  uniformly  around  the  cover  to maintain  a  leakproof  joint. Cleaning  Site The tank erection crew must clear out all of the debris, paper, and any other matter of an inflammable nature, leaving a clean and neat installation for the pipeline  crew  or  others.  All  of  the  tools  and  other erection equipment must be picked up and returned to the tank erection tool set. 9-16

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing