Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Cleanout Cover and Frame
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   

 

Back
Water Drawoff Valve
Up
Steelworker Volume 02 - Building manual for how to work with steel
Next
Cleaning  Site

the threads tight, the valve outlet must be facing the ground. Tank Outlets The   outlet   assembly   consists   of   an    elbow, fabricated,  made  up  with  a  flange,  inside,  cast  iron, and  a  gasket  installed  inside  the  tank  An  adapter, fabricated, steel pipe, made up with a flange, outside, cast iron, and a gasket are installed outside the tank The  outlet  end  of  the  adapter  is  sealed  with  a  cap (malleable   iron),   held   in   place   by   a   bolted   split coupling (malleable iron). The adapter and elbow are bolted together through the side of the tank. Cleanout Cover and Frame Special  bolt  channels  are  installed  inside  the tank  at  the  top  and  sides  of  the  cleanout  opening. Gaskets are installed over the bolts outside the tank. The  frame  is  a  fabricated,  rectangular  shaped, flanged  steel  sheet  that  is  flanged  all  of  the  way around,  both  front  and  back.  The  back  flanges  are radiused  to  fit  the  outside  of  the  tank.  The  holes  in the bottom flange are punched to fit the tank chime. Figure 9-24.—Bolts installed at cleanout opening. The  cleanout  cover  is  a  flat,  rectangular  steel sheet.  Two  formed,  round  steel  handles  are  welded the outside face of the sheet. HORIZONTAL   CHANNEL.—Place   the   bolt channel above the cleanout opening  inside  the  stave (fig.  9-24,  #l).  Insert  1/2-  by  1  l/4-inch  bolts  through all of the bolt holes. Be sure the bolt heads are square in  the  channel.   Install   the   gasket   along   the   full length of the top seam outside the stave. Allow a one bolt ho overlap at each end. VERTICAL CHANNEL.—  Each  side  seam  the cleanout  opening  consists  of  one  vertical  row  bolt holes.  Place  a  bolt  channel  inside  the  tank  on  each row  of  bolt  holes.  Insert  the  bolts  through  all  of  the bolt  holes.  Be  sure  the  bolt  heads  are  square  in  the channels. Install the gasket along the full length each row of bolts. Pass the gaskets over the top sea gasket. Allow  a  one  bolt  hole  overlap  at  each  en  Apply  a heavy  coating  of  sealing  putty  at  the  overlap  of  the top and vertical seam gaskets. Install the radii gasket under the vertical seam gaskets at the bottom chime of the stave. CLEANOUT    FRAME.—To     assist     in     the installation of the cleanout frame (fig. 9-25, #2), push all  of  the  chime  bolts  flush  with  the  gasket  on  the chime  of  the  bottom  to provide clearance for sliding Figure 9-25.—Cleanout cover installed. 9-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing