AS-BUILT DRAWINGS
(red-line) drawings to the ROICC. These drawings
show how the project was actually constructed.
During construction, the crew leader must keep all
prints updated and every 2 weeks check with the
PRELIMINARY ACCEPTANCE
engineering department to make sure they are making
the same updates. At the close of the project, the
At the completion of your project use the pre-BOD
battalion is required to turn in two sets of as-built
checklist (fig. 2-33, page 1, and fig. 2-34, page 2) to