Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Figure 2-34.-Pre-BOD inspection request (page 2).
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   

 

Back
Figure 2-33.—Pre-BOD inspection request (page 1).
Up
Naval Construction Force/Seabee 1&C - Construction manual for building structures
Next
Figure 2.35.-Punchlist from ROICC.

AS-BUILT  DRAWINGS (red-line)  drawings  to  the  ROICC.  These  drawings show  how  the  project  was  actually  constructed. During construction, the crew leader must keep all prints  updated  and  every  2  weeks  check  with  the PRELIMINARY ACCEPTANCE engineering department to make sure they are making the  same  updates.  At  the  close  of  the  project,  the At the completion of your project use the pre-BOD battalion is required to turn in two sets of as-built checklist (fig. 2-33, page 1, and fig. 2-34, page 2) to Figure 2-34.-Pre-BOD inspection request (page 2). 2-47