Figure 2-12.Operators Daily PM Report, Construction and Allied Equipment, NAVFAC 11260/4.
The Equipment Repair Order Worksheet (fig.
2-8) is used solely to list repair parts used. It is
REPAIR PARTS
used by the mechanic and shop supervisor to
ensure that all supply documents are attached to
the ERO. The cost control supervisor and the
maintenance supervisor use this form to record
the cost of repair parts properly.
The ERO is the sole authority to perform work
on equipment, whether the work is performed in
the field or in the shop. An ERO is required each
time labor time exceeds 1.0 hour or materials are
expended on scheduled PM, interim repairs,
modernization or alteration of equipment, or
deadline cycling or preservation of equip-
ment. The ERO Log Sheet (fig. 2-4) is one
means for keeping track of the status of the
EROS.
Any NCF unit has a wide variety of CESE
assigned to it. Large quantities of repair parts
are required to keep CESE in top operating
condition. Because of this, a Construction
Mechanic is assigned to supply to work in
the repair parts outlet to identify repair
parts, to provide counter help, and to act
as a warehouseman. He or she also acts as
an interface between supply and the maintenance
supervisor. The Construction Mechanic assigned
to this position is required to attend Shops Stores
Procedure Class, given by NCTC Port Hueneme,
California, to learn the full scope of his or her
responsibilities. (See COMCBPAC/COMCB-
LANTINST 4400.3 series for the NCTC SSPC
course number.)