b *Quality Control Plan. The project QC
.
Plan will come directly from the CAS sheets.
QC will produce a separate plan. Project and
QC will compare plans and resolve any
differences.
c *Safety Plan Cover Sheet. First sheet of
.
the project Safety Plan.
d *General Safety Plan. Second sheet of
.
the project Safety Plan. These are general
items that apply to almost all Construction
Activities. Specific items will be included on
the Safety Plan.
e. *Safety Plan The project Safety Plan will
come directly from the CAS Sheets. Include
all safety items not covered on the General
Safety Plan.
f. Environmental Plan. The project
Environmental Plan will come directly from
the CAS sheets
4B Cover Sheet.
a. Daily Quality Control Inspection
Report. Completed daily by the QC
representative.
b. Field Adjustment Request (FAR)
Submittal Log. Use this to record all FARs
whether approved or disapproved.
c. FAR. Use for all changes to the project.
Keep these to a minimum. Construct project
according to plans and specifications if
possible. Be clear and concise when
completing this. Attach drawings and extra
items as needed.
d. Request for Information (RFI) Submittal
Log.
e. RFI. Used for clarification of plans or
specifications only. All requests for changes
on the project will be submitted on a FAR.
f. Design Change Directives (DCD).
Include all ROICC directed changes to the
project.
g. Concrete Placement Clearance Form.
Must be completed 24 hours in advance of
concrete placement.
h. Pre-placement Photos for Concrete
Placement. Include views of forms, RST and
anchor bolts.
i. Asphalt Placement Clearance Form.
Must be completed 24 hours in advance of
required asphalt placement.
j. Utility Interruption Request. This is a
typical form. Each deployment site may be
different. Submit to Ops at least 2 weeks in
advance of required outage.
k. Excavation Request. This is a typical
form. Each deployment site may be different.
Submit to Ops at least 2 weeks in advance of
excavation.
1. Road Closure Request. This is a typical
form. Each deployment site may be different.
Submit to Ops at least 2 weeks in advance of
required closure.
m. Engineering Service Request. Submit to
Ops at least 5 days in advance of required
service.
n. Mineral Products Request. Submit to
MLO at least 2 weeks in advance of required
delivery date.
o. Other QC Forms.
p. Daily Safety Inspection Report. Will be
completed daily by the Battalions Safety
Inspector.
q. Emergency Phone Numbers. Will be
removed from the project package and posted
at the jobsite.
r. Navy Employee Report of Unsafe or
Unhealthful Working Conditions. Will be
removed from the project package and posted
at the jobsite.
s. Required Safety Equipment.
t. Daily Safety Lecture Log. Record daily
and forward a copy to Safety as required.
u. Accident/Near Mishap/Mishap
Reports. In the event of a mishap, this will
be submitted to Safety within 24 hours on
workdays. If during off duty hours, by close
of business the next workday. This does NOT
take the place of medical reports or other
reports that may be required by Safety.
v. Highlighted 29 CFR 1926.
w. Hazardous Materials Inventory Sheet.
Submit a copy to Environmental/Safety as
required.