Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Bridging between Joists
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   

 

Back
Interior  Support
Up
Builder 3&2 Volume 02 - Construction manual for building structures
Next
Placing Floor Joists

Figure  1-25.—Joists  supported  by  S-beam  using  wooden  blocks. construction. Figure 1-25 shows the lapped (view A) and butt (view B) methods of framing over girders. Bridging between Joists Floor   plans   or   specifications   usually   call   for bridging between joists. Bridging holds the joists in line and helps distribute the load carried by the floor unit. It is usually required when the joist spans are more than 8 feet. Joists spanning between 8 and 15 feet need one row of bridging at the center of the span. For longer spans, two rows of bridging spaced 6 feet apart are required. CROSS   BRIDGING.—   Also   known   as herringbone  bridging,  cross  bridging  usually  consists  of 1- by 3-inch or 2- by 3-inch wood. It is installed as shown in figure 1-26. Cross bridging is toenailed at each Figure 1-26.—Wood cross bridging. end with 6d or 8d nails. Pieces are usually precut on a radial-arm saw. Nails are started at each end before the cross bridging is placed between the joists. The usual procedure is to fasten only the top end of the cross bridging. The nails at the bottom end are not driven in until the subfloor has been placed. Otherwise the joist could be pushed out of line when the bridging is nailed in. An  efficient  method  for  initial  placement  of  cross bridging is shown in figure 1-26. In step 1, snap a chalk line where the bridging is to be nailed between the joists. In step 2, moving in one direction, stagger and nail the 1-12

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing