Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Generator Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   

 

Back
Table 3-1.—Types of Portable Generators
Up
Construction Electrician Intermediate - Electricity handbook for electricians
Next
Generator Set Inspection

The   demand   factor   varies   considerably   for different types of loads. services, and structures. The National  Electrical  Code®.  Article  220.  provides  the requirements   for   determining   demand   factors. Demand factors for some military structures are given in table 3-2. Example: A machine shop has a total connected load of 50.3 kilowatts. The demand factor for this type of structure is taken at 0.70. The maximum demand is 50.3  ×  0.70  =  35.21  kilowatts. GENERATOR  INSTALLATION Generators are not permitted to be closer than 25 feet to a load; however, in setting up the generator, try to place the equipment near points of large demand to reduce the size of wire required: to hold the line losses to a minimum. and to afford adequate voltage control at the remote ends of the lines. Moving the generator may be accomplished by lifting or pulling. The generator set comes equipped with a lifting sling usually stored in the skid on the side of the unit opposite the operator’s control panel. Site  Selection You should study a plot or chart of the area on which the individual buildingsand facilities have been plotted. The site you select should be large enough to meet present and anticipated needs. Then select a location where there will be sufficient space on all sides for servicing and operation of the unit. It should be level. dry, and well drained. If this type of site is not available, place the generator set on planks, logs, or other material for a suitable base foundation. Table 3-2.—Demand Factor Structure Demand  Factor Housing Aircraft maintenance facilities Operation   facilities Administrative facilities Shops Warehouses Medical   facilities Theaters NAV aids Laundry, ice plants, and bakeries All  others 3-4 0.9 .7 .8 .8 .7 .5 .8 .5 .5 1.0 .9 Sheltering  of  Generators Although  advanced  base  portable  generators  are designed to be operated outdoors, prolonged exposure to  wind.  rain.  and  other  adverse  conditions  will definitely shorten their lives. If the generators are to remain on the site for any extended period of time, they should be mounted on solid-concrete foundations and installed under some type of shelter. Presently, there are no predrawn plans for shelters for a small advanced base generating station. The shelter will be an on-the-spot affair, the construction of which is determined by the equipment and material on hand plus your ingenuity and common sense. Before a Builder can get started on the shelter, you will have to inform him of such things as the number of generators to be, sheltered; the dimensions of the generators; the method of running the generator load cables  from  the  generator  to  the  distribution  system outside  the  building;  and  the  arrangement  of  the exhaust  system,  radiator  discharge,  and  cooling  air. Installation   specifications   are   available   in   the manufacturer’s  instruction  manual  that  accompanies each   unit.   Be   sure   to   use   them.   Appropriate consultation  with  the  Builder  regarding  these  speci- fications may help minimize various installation and piping problems and costs. The following hints and suggestions also will be helpful: 1. Ventilation is an important factor to consider when you are installing the units inside a building. Every  internal  combustion  engine  is  a  HEAT  engine. Although heat does the work, excess amounts of heat must be removed if the engine is to function properly. Heat can be removed by setting the engine radiator grille near an opening in the wall and providing another opening directly opposite the unit. In this manner, cool air can be drawn in and the hot air directed outdoors. These  openings  can  be  shielded  with  adjustable  louvers to prevent the entrance of rain, sand, or snow. In addition, when the engine is operating in extremely cold weather. the temperature in the room can be controlled by simply closing a portion of the discharge opening. Additional doors or windows should be provided in the shelter if the plants are installed in localities where the summer  temperatures  exceed  80°F  at  any  time. 2.   Working space is another consideration. Be sure to provide sufficient space around each unit for repairs or  disassembly  and  for  easy  access  to  the  generator control panels.