Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Paralleling Procedures
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   

 

Back
Operating Procedures for Paralelling Generators
Up
Construction Electrician Basic - Electricity handbook for electricians
Next
Stopping Generator Set Operation

Figure 3-20.—Parallel operation connection diagram. SYNCHRONIZING LIGHTS (fig. 3-19) will bring the phase and frequency into exact agreement. As the phase and   frequency   approach   the   same   value,   the SYNCHRONIZING LIGHTS will gradually turn on and off. When the blinking slows to a rate of once per second or slower, close the main circuit breaker of the incoming set while the SYNCHRONIZING LIGHTS are at a point of being dark.  The phase sequence relates to  the  order  in  which  the  generator  windings  are connected. If the phase sequence is not correct, the SYNCHRONIZING LIGHTS will not blink on and off together. When the incoming set is first connected to the load through the appropriate switchgear (fig. 3-20). you should observe one of four occurrences. When the phase sequence, voltage, frequency, phase, and engine performance are the same, the changeover will be smooth with only the slightest hesitation in engine speed; if each output is slightly out of phase, one of the engines will shudder at the point of changeover; if the phase sequence or voltage levels are incorrect, the reverse power relay will trip on one of the generator sets and open its main circuit breaker contactors; if the incoming generator set loses speed significantly or almost stalls, the incoming engine may be defective. CAUTION Should either generator set lose speed, buck, or shudder when the incoming set is connected  to  the  distribution  feeder  lines, immediately flip the CKT BRK switch of the incoming set to open, and then recheck the paralleling set-up procedures. Refer  to  figures  3-19  and  3-20  to  set  up  the generator sets for parallel operation. WARNING When  performing  step  1,  make  certain  that the incoming set is shut down and that there are no voltages at the switchgear terminals being connected to the incoming set. Do not take anybody’s  word  for  it!  Check  it  out  for yourself!  Dangerous  and  possibly  deadly voltages could be present. Take extreme care not to cross the LO (neutral) with any of the other phases (L1, L2, or L3). Paralleling Procedures 1. Connect the incoming set, as shown in figure 3-20. 2. Make certain that the voltage change board (reconnection  board)  (fig.  3-12)  of  the  incoming generator is set up for the same output voltage as the on- line  generator. 3. Set CKT BRK switch on the incoming set to OPEN. When the incoming set circuit breaker is open (CKT BRK indicator light will be out), operate the load switchgear so that the on-line output voltage is present at the voltage change board of the incoming set. 4. Set the PARALLEL OPERATION-SINGLE UNIT operation switch on both sets to PARALLEL OPERATION. 3-25