Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: Chapter 3 Power Generation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   

 

Back
Schematic  Diagram
Up
Construction Electrician Basic - Electricity handbook for electricians
Next
Figure 3-1.—Typical 60-kW generator set.

CHAPTER 3 POWER GENERATION Generators   play   an   important   part   in   your assignment with the Seabees. Whether operating a generator as a main power source or as standby power or as emergency power, you need a through knowledge of their hookup, operation, and maintenance. At the completion of this chapter, you should know how to install generators of the advanced-base type, stand   a   generator   watch,   perform   preventive maintenance,  and  make  minor  repairs  on  power generators and control equipment. Theory for both dc and ac generators is included in Navy  Electricity  and  Electronics  Training  Series (NEETS), Module 5. Generator theory will not be covered in this chapter. Keep in mind that the generator (alternator)  in  an  automobile  works  on  the  same principle as does the huge turbine generator used in a nuclear power station. INSTALLATION  AND  SERVICING GENERATORS Most of the generators you are likely to work with in the Naval Construction Force (NCF) range in size from 5 kW to 200 kW. Generators in these sizes range in weight from 488 pounds (221.4 kg) to 10,500 pounds (4770 kg).  All of these units are mounted on skid bases. Lifting and tie-own attachments are provided. All have provisions for lifting with a forklift of the appropriate capacity (with the exception of the 5-kW gas-driven generator  set,  which  does  not  include  the  forklift provision). Several factors should be considered before a final decision is made about where to locate a generator. The noise levels of generators sized from 5 kW to 200 kW range from 77 dBa to 93 dBa (adjusted decibels) at 25 feet. Generator noise is a problem in low-noise level or quiet areas (libraries, offices, hospitals, chapels, etc.). The operating 60-kW generator, for example, presents a noise hazard (84 dBa to 91 dBa, depending on the model) to all personnel in the immediate area. The noise level near the unit exceeds the allowable limits for unprotected personnel. Therefore, everyone working around the generator needs single (noise < 84 dBa) or double hearing protection (noise > 104 dBa). Placing a generator set near points of large demand will reduce the size of wire required, hold the line losses to a minimum, and afford adequate voltage control at the remote ends of the lines. The following points should be considered before an exact site is chosen for a generator set: 1. Generators must not be closer than 25 feet (7.6 meters) to a load because of noise, fire hazard, and air circulation. 2. The set must be placed on a stable, preferably level, foundation. It should not be operated while inclined more than 15 degrees from level. 3. The site must be within 25 feet (7.6 meters) of any paralleled generator set and within 25 feet (7.6 meters) of any auxiliary fuel supply. 4. When preparing a temporary installation, you should move the generator set as close to the jobsite as practical. In an area where the ground is soft, do not remove the wood-skid base if you have not already done so.  The  wood-skid  base  will  establish  a  firm  foundation on soft ground, mud, or snow; otherwise, use planks, logs, or other material for a base in an area where the ground is soft. Although  advanced-base  portable  generators  are designed to be operated outdoors, prolonged exposure to  wind,  rain,  and  other  adverse  conditions  will definitely shorten their lives. When the generators are to remain on the site for any extended period of time, they should be mounted on solid-concrete foundations and should be installed under some type of shelter. There are no predrawn plans for shelters for a small advanced-base  generating  station.  The  shelter  will  be an on-the-spot affair—the construction of which is determined  by  the  equipment  and  material  on  hand  plus your  ingenuity,  common  sense,  and  ability  to  cooperate with personnel in other ratings.  Before a Builder can get started  on  the  shelter,  you  will  have  to  furnish information, such as the number of generators to be sheltered, the dimensions of the generators, the method of running the generator load cables from the generator to the panelboard and from the panelboard to the feeder 3-1