Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section VI. PREPARATION FOR SHIPMENT AND STORAGE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Section V. DISASSEMBLY/ASSEMBLY
Up
TM-55-4920-410-13P Vibrex Balancing Kit Part No. D4591 Manual
Next
Figure  4-2.  Power  Source-Equipment  Setup

TM  55-4920-410-13&P Section VI.  PREPARATION  FOR  SHIPMENT  AND  STORAGE 4-17.   General.   Preparation    for    shipment and/or  storage  depends  upon  whether  test  set  is retained  in  unit  area  evacuated.  Storage  in  unit area,  when  authorized,  is  on  a  rotational  basis and is known as Administrative Storage. 4-18.   Levels   of   [protection.   Select  the  level  of protection  which  best  suits  the  circumstances  and follow the instructions for that level. a. Level A. Use this level if shipment is into or out of a combat theater or is destined for outdoor storage or is destined for indoor storage exceeding five years. b. Level B. Use this level if the shipment involves over- seas surface transit and/or is destined for indoor storage up to five years. c. Level C. Use this level if shipment is entirely with- in CONUS and storage will not exceed two years. 4-19.    Procedures, a. For All Levels.  Clean the test set thoroughly of all contamination and debris. Use no cleaning fluids or preservative materials. Package each test set individual- ly. Each individual package can be shipped without pack- ing. Cushion the test set in 2 inches of one pound density polyethylene  foam  conforming  to  PPP-C-1752  and  include eight units of desiccant conforming to MIL-D-3464 with- in the unit. b. Unit Container. Provide a snug fitting unit contain- er as follows: (1) Level A. Wood-cleated, plywood conforming to style I, overseas type of PPP-B-601. (2) Level B. Weather-resistant fiberboard container conforming to PPP-B-636. (3) Level C. Domestic class fiberboard container con- forming  to  PPP-B-636. c. Marking. Mark all shipments in accordance with MIL-STD-129. Change   1   4-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing