Click here to make tpub.com your Home Page

Page Title: Section IV. PREPARATION FOR MOVEMENT cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section III. OPERATION UNDER UNUSUAL
Up
TM-11-7440-278-14 Data Analysis Services Support Systems AN/MYK-8(V) 1 and AN/MYK-8(V)3 Manual
Next
CHAPTER 4 OPERATOR AND ORGANIZATIONAL MAINTENANCE INSTRUCTIONS

TM 11-7440-278-14
vans, the power distribution box, and the engine
(6)  Remove the canopy support brackets from
generators. Install dust covers.
each van by removing the three bolts and washers
g. Coil the cables removed in d above and store in
serving each bracket. Place the bolts and washers in a
bag or cloth and tie to each bracket.
assigned location.
h. Disconnect the remaining cables connected to
(7)  Lift the two deck ramps from the deck.
(8)  Lift the deck plate from the angle brackets.
the prime-power distribution box. Place dust covers on
(9)  Release each angle bracket from the van
cable connectors.
by turning the locking handles. Pull the bracket from the
i.  Remove   the prime-power   distribution box
van.
ground rod.
Install dust covers on prime-power
distribution box connectors.
j.  Store the prime-power distribution box and
3-9.
Preparation for Transport
ground rod in their assigned storage locations.
To prepare the vans for transport, perform the following
k.  Disconnect each remaining cable from the
procedures:
engine generator set load terminals.
NOTE
l.  Store the cables in their assigned storage
Ensure that the ADP equipment backup
location.
procedures  contained  in  applicable
m. Remove the ground cable connected between
publications listed in appendix A of this
vans.
man-ual have been completed and units
n. Remove the ground rods attached to the prime-
are located in transport position prior to
power connector panel of each van.
performing the following procedures.
o. Store the ground cables and grounding rods
a. Couple the prime mover to the van.
removed in m and n above in their assigned storage
b. Connect the airbrake hoses and electrical cables
location.
p. Disassemble the passageway and store. Using
between the prime mover and the van.
c.  Raise front landing gear units and rear leveling
four persons, disassemble the passageway as follows:
(1)  Loosen the straps at the top and bottom of
jacks to a fully retracted position.
d. Remove wheel chocks and leveling plates and
the canopy.
(2)  Release the snaps at each van.
secure them in their assigned storage location.
(3)  Remove the two canopy sections from the
e. On OL-88(V)3/MYK-8(V) and OL-89(V) 3/MYK-
passageway.
8(V) vans only, the front and rear standing platforms
(4)  Release the locking plates and lift the three
must be folded up against the van exterior and properly
canopy supports off the screws in the canopy support
secured.
b)rackets.
f.  Check to see that the van braking system is
(5)  Release the locking plates and lift the
working properly.
handrail from the fittings securing the rail.
3-8