Click here to make tpub.com your Home Page

Page Title: Section IV. PRELIMINARY ADJUSTMENT OF EQUIPMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-4. Installation of passageway.
Up
TM-11-7440-278-14 Data Analysis Services Support Systems AN/MYK-8(V) 1 and AN/MYK-8(V)3 Manual
Next
Installation of Van Ground Rods

TM 11-7440-278-14
Figure 2-5. Sunshade Installation.
c.  Insert each standoff rod into its corresponding
ladder can be used to gain access to the van roof. Install
the shade as follows:
grommet.
a. Install support assembly and standoff rods.
d. Secure the shade by fastening the shade's nylon
b. Starting from either the front or rear of the van,
ropes to their associated van tie-down hooks.
unroll the shade over the support assembly.
Section IV. PRELIMINARY ADJUSTMENT OF EQUIPMENT
properly emplaced and is in a condition ready for
2-10. Extent of Preliminary Checks and Adjustments
operation.
The preliminary checks and adjustments for the
AN/MIYK8(V) (*) consist of grounding the assemblages,
2-11. Grounding
connecting power, and then performing a check of the
power, lighting, and climate control system.  These
The assemblages, including the prime power distribution
procedures ensure that the AN/MYK-8(V) (*) has been
box and the power generator (if one is used), must be
properly grounded before signal
2-6

Privacy Statement - Press Release - Copyright Information. - Contact Us