Click here to make tpub.com your Home Page

Page Title: Figure 2-2. OL-88(V)(*)/MYK-8(V) and OL-89(V)(*)/MYK-8(V), Block Diagram.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Chapter 2 SERVICE UPON RECEIPT AND INSTALLATION
Up
TM-11-7440-278-14 Data Analysis Services Support Systems AN/MYK-8(V) 1 and AN/MYK-8(V)3 Manual
Next
Figure 2-3. Typical Positioning of AN/MYK-8(V)(*).

TM 11-7440-278-14
Figure 2-2. OL-88(V)(*)/MYK-8(V) and OL-89(V)(*)/MYK-8(V), Block Diagram.
c.  V460/MIK8(V).  The V460/MYK8(V) contains a
drainage, permitting the proper installation of ground
rods.
Model 1800 Decollater, IBM 129 Card Data Recorder,
b.  Power Source Site.  If a generator is used to
KYBE TMS70 Tape Cleaner/ Verifier, and Bell and
provide primary power, it should be located downwind
Howell TD29034B Degausser, all used in conjunction
and approximately 50 feet from the assemblages to
with equipment in the OL88(V) (*)/MYK8(V)  and the
minimize fire, fume hazards, and generator noise
OL89 (V) (*)/MYK-8 (V).
interference. The prime and auxiliary generators should
be located in a level area of approximately 50 feet by 50
2-2. Siting
feet, with a slope of no more than 15 degrees.
The best operating site for the AN-MYK-8(V) (*) is
c. Security Considerations. The system should be
determined by the tactical situation and other local
sited in a secure perimeter.
conditions. The system should be positioned as shown
in figure 23. The site selected should meet the following
2-3. Shelter Requirements
requirements:
The shelter requirements for the AN/MYK8(V) (*) are
a. Assemblage Site. The site selected should be in
satisfied by the vans and shelter in which the system
an open area of approximately 100 feet by 100 feet and
equipment is enclosed.
relatively level with a slope of no more than 12 degrees.
The soil composition must be firm and dry, with good
Section II. SERVICE UPON RECEIPT OF MATERIEL
2-4. Unpacking
2-5. Checking Unpacked Equipment
a. Inspect the equipment for damage incurred during
Unpacking of the vans will be performed by qualified
ADPE personnel.
shipment. If the equipment has been dam-
2-2