Click here to make tpub.com your Home Page

Page Title: RUN SELF TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section Ill. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Up
TM-11-7025-234-23 Modem Unit MD-1149/MYQ-4A Manual
Next
RUN SELF TEST (CONT)

TM 11-7025-234-23
3-12. RUN SELF TEST
NOTE
This procedure tests:
Lamp indicators, steps 1-3
Data in/data out, steps 4-6
Data in/data out transmitter-
receiver, steps 8-9
Data in/data out transmitter-
receiver, output amplifier-
input AGC, steps 11-12
1. Apply power by pressing power switch
to ON.
2. Lower front panel cover.
3. Press and hold LAMP CHK. Observe
all indicators.  If any fail to
light, maintenance is required.
4. Press DC BUS switch until it remains
depressed.  This activates the
loopback circuit.
5. Press DATA CLAMP so it remains in
the depressed position.
6. Observe XMT DATA and RCV DATA
indicators.  XMT DATA indicator
should be OFF, and RCV DATA
indicator should be ON.
o If condition is not met, test
fails and maintenance is required
7. Press DATA CLAMP off and DC BUS off.
3-3

Privacy Statement - Press Release - Copyright Information. - Contact Us