Click here to make tpub.com your Home Page

Page Title: Tool and Test Equipment Requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
APPENDIX C MAINTENANCE ALLOCATION
Up
TM-11-5820-803-12 Modem Digital Data MD-921/G (NSN 5820-00-155-8581) Manual
Next
SECTION II. MAINTENANCE ALLOCATION CHART FOR MODEM, DIGITAL DATA-PHASE SHIFT KEYING MD-921/G

TM 11-5820-803-12
L-Selected repair activity (SRA). If a SRA facility
b. Column 2, Component/Assembly.  Column 2
is not available, this category of maintenance
contains the noun names of components, assemblies,
will be accomplished at a depot
subassemblies, and modules for which maintenance is
D-Depot
authorized.
e. Column 5, Tools and Equipment.  Column 5
c. Column 3, Maintenance Functions.  Column 3
specifies by code, those common tools sets (not
lists the functions to be performed on the item listed in
individual tools) and special tools, test, and support
column 2. When items are listed without maintenance
equipment required to perform the designated function.
functions, it is solely for purpose of having the group
numbers in the MAC and RPSTL coincide.
C-4.
Tool and Test Equipment Requirements
d. Column 4, Maintenance Category.  Column 4
specifies, by the listing of a "worktime" figure in the
a. Tool or Test Equipment Reference Code. The
appropriate  subcolumn(s),  the  lowest  level  of
numbers in this column coincide with the numbers used
maintenance authorized to perform the function listed in
in the tools and equipment column of the MAC.  The
column 3. This figure represents the active time required
numbers indicate the applicable tool or test equipment
to perform that maintenance function at the indicated
for the maintenance functions.
category of maintenance. If the number or complexity of
the tasks within the listed maintenance function vary at
b. Maintenance Category.
The codes in this
different maintenance categories, appropriate "worktime"
column indicate the maintenance category allocated the
figures will be shown for each category. The number of
tool or test equipment.
man-hours specified by the "worktime" figure represents
c. Nomenclature. This column lists the noun name
the average time required to restore an item (assembly,
and nomenclature of the tools and test equipment
subassembly, component, module, end item or system)
required to perform the maintenance functions.
to a serviceable condition under typical field operating
d. National/NATO Stock Number. This column lists
conditions.
This time includes preparation time,
the National/NATO stock number of the specific tool or
troubleshooting  time  and  quality  assurance/quality
test equipment.
control time in addition to the time required to perform
e. Tool  Number.
This  column  lists  the
the specific tasks identified for the maintenance
manufacturer's part number of the tool followed by the
functions authorized in the maintenance allocation chart.
Federal Supply Code for manufacturers (5-digit) in
parentheses.
Subcolumns of column 4 are as follows:
O-Operator/crew
O-Organizational
F-Direct support
Change 1 C-2

Privacy Statement - Press Release - Copyright Information. - Contact Us