Click here to make tpub.com your Home Page

Page Title: Chapter 6 DIRECT SUPPORT AND GENERAL SUPPORT AND DEPOT MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Common Alarm Circuitry
Up
TM-11-5805-424-15 Modem Low Speed Wire Line MD-674(P)/G Manual
Next
Operational Tests

TM 11-5805-424-15/NAVSHIPS 0967-220-9010/TO 31W2-2G-41
CHAPTER 6
DIRECT SUPPORT AND GENERAL SUPPORT AND
DEPOT MAINTENANCE
6-1. General
6-2. Troubleshooting Procedures
a.  Troubleshooting  at  direct  support,  general
a. Sectionalization.
Sectionalization procedures
support, and depot maintenance categories includes all
normally performed at an organizational category (ch 4)
techniques outlined for organizational maintenance and
sectionalize the trouble to a defective MD-674(P)/G or
any special or additional techniques required to isolate a
printed-circuit card. When a defective MD-674(P)/G or
defective  part.
These  maintenance  procedures
printed-circuit card is received, localize the trouble to a
supplement the procedures described for organizational
stage (b below) and then isolate the trouble within the
maintenance.
The  systematic  troubleshooting
procedures, which begins with the operational and
stage (c below).
sectionalization checks performed at an organizational
category must be completed by further localizing and
b. Localization. Perform the operational test (para
isolating techniques. Refer to appendix C to determine
6-3) with the defective MD-674(P)/G or defective
the maintenance function allocated to each category of
printed-circuit  card  installed  in  the  MD-674(P)/G
maintenance  and  the  tools  and  test  equipment
available for maintenance. If the correct results are not
authorized to perform the maintenance function.
obtained during the operational tests, refer to the
troubleshooting chart (para 6-4) to localize the trouble to
b. Troubleshooting may be performed while the
a stage.  Then isolate the trouble within the stage (c
equipment is operating as part of a system, or after it
below).
has been removed from service. When troubleshooting
is performed while the equipment is operating as part of
c. Isolation. When the trouble has been isolated to
a system, it is normally done by organizational
a stage (b above), isolate the trouble to the defective
personnel.  When troubleshooting is done with the
part by using the procedures described in paragraph 6-5.
equipment  removed  from  service,  perform  the
operational tests (para 6-3) to determine symptoms to
d. Deleted.
aid in locating the trouble.
Change 5
6-1

Privacy Statement - Press Release - Copyright Information. - Contact Us