|
| |
TM-5-4220-225-24P0001.gif TM-5-4220-225-24P0002.gif TM-5-4220-225-24P0003.gif TM-5-4220-225-24P0004.gif TM-5-4220-225-24P0005.gif
Tm-5-4220-227-14
-
Chapter 1 Introduction
-
List Of Abbreviations
-
Section Ii. Equipment Description And Data
-
Location And Description Of Major Components
-
Figure 1-2. Location And Description Of Major Components (Sheet 1 Of 2)
-
Figure 1-2. Location And Description Of Major Components (Sheet 2 Of 2)
-
Equipment Data
-
Compressed Air Supply Requirements
-
Safety, Care, And Handling
-
Section Iii. Principles Of Operation
-
Figure 1-3. Flow Diagram (Sheet 1 Of 3)
-
Key Text Legend
-
Figure 1-3. Flow Diagram (Sheet 3 Of 3).
-
Figure 1-4. Electrical Diagram
-
Chapter 2 Operating Instructions
-
Ofigure 2-1. Electrical Control Panel Controls And Indicators (Sheet 1 Of 2)
-
Figure 2-1. Electrical Control Panel Controls And Indicators (Sheet 2 Of 2)
-
General.
-
General. (Cont)
-
Figure 2-2. Chamber Control Console Controls And Indicators
-
General. (Cont)
-
Figure 2-3. Gages, Valves, And Switches Controls And Indicators (Sheet 1 Of
2).
-
Figure 2-3. Gages, Valves, And Switches Controls And Indicators (Sheet 2 Of
2)
-
General. (Cont)
-
Section Ii. Operator Preventive Maintenance Checks And Services (Pmcs)
-
Reporting Deficiencies
-
Table 2-1. Operator Preventive Maintenance Checks And Services (Pmcs)
(Cont).
-
Scrubber Service
-
Figure 2-4. Scrubber Assembly, Service.
-
Section Iii. Operation Under Usual Conditions
-
Figure 2-5. Recompression Chamber Operating Procedure Flowchart
-
Figure 2-6. Door Procedure Plate
-
Figure 2-7. Warning Plates
-
Figure 2-8. Manufacturer's Data Plates
-
Figure 2-9. Ansi/Asme Certification Data Plate
-
Figure 2-10. System Startup Checklist (Sheet 1 Of 11)
-
Figure 2-10. System Startup Checklist (Sheet 2 Of 11)
-
Figure 2-10. System Startup Checklist (Sheet 3 Of 11).
-
Figure 2-10. System Startup Checklist (Sheet 4 Of 11 )
-
Figure 2-10. System Startup Checklist (Sheet 5 Of 11 )
-
Ufigure 2-10. System Startup Checklist (Sheet 6 Of 11)
-
Figure 2-10. System Startup Checklist (Sheet 7 Of 11).
-
Figure 2-10. System Startup Checklist (Sheet 8 Of 11)
-
Figure 2-10. System Startup Checklist (Sheet 9 Of 11)
-
Figure 2-10. System Startup Checklist (Sheet 10 Of 11).
-
Figure 2-10. System Startup Checklist (Sheet 11 Of 11)
-
Normal Operating Procedures
-
Figure 2-11. Normal Operating Procedures Checklist (Sheet 1 Of 9)
-
Figure 2-11. Normal Operating Procedures Checklist (Sheet 2 Of 9)
-
Figure 2-11. Normal Operating Procedures Checklist (Sheet 3 Of 9)
-
Figure 2- 1. Normal Operating Procedures Checklist (Sheet 4 Of 9)
-
Figure 2-11. Normal Operating Procedures Checklist (Sheet 5 Of 9)
-
Figure 2-11. Normal Operating Procedures Checklist (Sheet 6 Of 9)
-
Figure 2- 11. Normal Operating Procedures Checklist (Sheet 7 Of 9)
-
Figure 2-11. Normal Operating Procedures Checklist (Sheet 8 Of 9)
-
Figure 2-11. Normal Operating Procedures Checklist (Sheet 9 Of 9)
-
Shutdown Procedures.
-
Figure 2-12. Shutdown Procedures Checklist (Sheet 1 Of 7).
-
Figure 2-12. Shutdown Procedures Checklist (Sheet 2 Of 7).
-
Figure 2-12. Shutdown Procedures Checklist (Sheet 3 Of 7).
-
Figure 2-12. Shutdown Procedures Checklist (Sheet 4 Of 7).
-
Figure 2-12. Shutdown Procedures Checklist (Sheet 5 Of 7).
-
Figure 2-12. Shutdown Procedures Checklist (Sheet 6 Of 7).
-
Figure 2-12. Shutdown Procedures Checklist (Sheet 7 Of 7).
-
Figure 2-13. Modified Startup Procedures Checklist (Sheet 1 Of 5).
-
Figure 2-13. Modified Startup Procedures Checklist (Sheet 2 Of 5)
-
Figure 2-13. Modified Startup Procedures Checklist (Sheet 3 Of 5)
-
Figure 2-13. Modified Startup Procedures Checklist (Sheet 4 Of 5)
-
Figure 2-13. Modified Startup Procedures Checklist (Sheet 5 Of 5).
-
Figure 2-14. Modified Shutdown Procedures Checklist (Sheet 1 Of 5)
-
Figure 2-14. Modified Shutdown Procedures Checklist (Sheet 2 Of 5)
-
Figure 2-14. Modified Shutdown Procedures Checklist (Sheet 3 Of 5).
-
Figure 2-14. Modified Shutdown Procedures Checklist (Sheet 4 Of 5).
-
Figure 2-14. Modified Shutdown Procedures Checklist (Sheet 5 Of 5).
-
Section Iv. Operation Under Unusual Conditions
-
Figure 2-15. Emergency Procedures Checklist (Sheet 1 Of 8)
-
Figure 2-15. Emergency Procedures Checklist (Sheet 2 Of 8)
-
Ufigure 2-15. Emergency Procedures Checklist (Sheet 3 Of 8)
-
Figure 2-15. Emergency Procedures Checklist (Sheet 4 Of 8)
-
Figure 2-15. Emergency Procedures Checklist (Sheet 5 Of 8)
-
Figure 2-15. Emergency Procedures Checklist (Sheet 6 Of 8)
-
Figure 2-15. Emergency Procedures Checklist (Sheet 7 Of 8).
-
Figure 2-15. Emergency Procedures Checklist (Sheet 8 Of 8)
-
Chapter 3 Operator Maintenance
-
Section Ii. Operator Troubleshooting Procedures
-
Chapter 4 Unit Maintenance
-
Section Ii. Service Upon Receipt
-
Figure 4-1. End View
-
Figure 4-2. Elevation View
-
Oxygen Supply
-
Chamber Doors (I/L And O/L)
-
Electrical Connections
-
Table 4-1 Unit Preventive Maintenance Checks And Services (Pmcs)
-
Table 4-1. Unit Preventive Maintenance Checks And Services (Pmcs) (Cont).
-
Table 4-1. Unit Preventive Maintenance Checks And Services (Pmcs) (Cont).
-
Service Of Door Seals
-
Figure 4-4. Service Of Medical Lock Outer Door Seals
-
Figure 4-5. Service Of Medical Lock Inner Door Seals
-
Symptom Index
-
Table 4-2. Unit Troubleshooting Procedures.
-
Table 4-2. Unit Troubleshooting Procedures (Cont).
-
Table 4-2. Unit Troubleshooting Procedures (Cont).
-
Table 4-2. Unit Troubleshooting Procedures (Cont).
-
Table 4-2. Unit Troubleshooting Procedures (Cont).
-
Table 4-2. Unit Troubleshooting Procedures (Cont).
-
Section V. Unit Maintenance Procedures
-
Depressurization Valve And Gage (Medical Lock).
-
Figure 4-6. Depressurization Valve And Gage, Replace
-
Pressurization Valve (Inner Lock Door)
-
Figure 4-7. Pressurization Valve (Inner Lock Door), Replace
-
Cot Assemblies (I/L).
-
Figure 4-8. Cot Assemblies, Replace
-
Deck Plates
-
Figure 4-9. Deck Plates, Replace
-
Heater/Chiller Module
-
Figure 4-10. Heater/Chiller Module, Replace.
-
Pressure Relief Valve Assembly
-
Ofigure 4-11. Pressure Relief Valve Assembly, Replace
-
Water Valves (3/4 In.).
-
Figure 4-12. Water Valves (3/4 In.), Replace.
-
Water Valves (3/4 In.) (Cont).
-
Figure 4-13. Heater/Chiller Fluid Valves Repair
-
Hoses
-
Figure 4-14. Hoses, Replace
-
Power Supply, 28v
-
Figure 4-15. Power Supply, 28v, Replace
-
Scrubber Assembly
-
Figure 4-16. Scrubber Assembly, Replace.
-
Portable Oxygen Analyzer (Poa)
-
Figure 4-17. Portable Oxygen Analyzer (Poa), Replace.
-
Thermocoupler Meter And Temperature Probe
-
Figure 4-18. Thermocoupler Meter And Temperature Probe, Replace.
-
Ground Fault Interrupter
-
Figure 4-19. Ground Fault Interrupter, Replace
-
Six Plug Receptacle Power Strip.
-
Figure 4-20. Six Plug Receptacle Power Strip, Replace.
-
Double Light Power Supply (Inner Lock).
-
Figure 4-21. Double Light Power Supply (Inner Lock), Replace
-
Repair
-
Figure 4-22. Double Light Power Supply (Inner Lock) Fuse, Replace
-
Light Source
-
Figure 4-23. Light Source, Replace
-
Repair.
-
Figure 4-24. Light Source, Repair
-
Single Light Power Supply (Outer Lock)
-
Figure 4-25. Single Light Power Supply (Outer Lock), Replace
-
Repair.
-
Figure 4-26. Single Light Power Supply (Outer Lock) Fuse, Replace.
-
Single Light Power Supply (Outer Lock).
-
Figure 4-27. Fluorescent Light Assembly, Replace
-
Repair
-
Figure 4-28. Fluorescent Light Assembly, Repair
-
Wiring Harness
-
Figure 4-29. Wiring Harness, Fuse Replace
-
Communicator Assembly
-
Figure 4-30. Communicator Assembly, Replace.
-
Battery Card And Case
-
Figure 4-31. Battery Card And Case, Fuse Replacement.
-
Microphone
-
Figure 4-32. Microphone, Replace
-
Headset
-
Figure 4-33. Headset, Replace
-
Sound Powered Phones And Bracket
-
Figure 4-34. Sound Powered Phones And Bracket, Replace
-
Speakers, I/L And O/L
-
Figure 4-35. Speakers, I/L And O/L, Replace
-
O2k Bottles And Manifold
-
Figure 4-36. 02 K Bottles And Manifold, Replace.
-
Oxygen Inhalator Mask Assembly.
-
Figure 4-37. Oxygen Inhalator Mask, Replace
-
Section Vi. Unit Level Cleaning Procedure For Diving Life Support Air
Systems
-
Installation Or Reinstallation
-
Cleaning Components Or Assemblies
-
Cleaning Method Trisodium Phosphate (Tsp).
-
Table 4-3. Tsp Cleaning Solution Volume.
-
Table 4-4. Cleaning Solution Flow Rate
-
Table 4-5. Cleaning Agents Comparable With Soft Goods.
-
Hydrocarbon Inspection And Analysis.
-
Documentation And Record Keeping
-
Chapter 5 Direct Support Maintenance
-
Direct Support Troubleshooting Procedures
-
Table 5-1. Direct Support Troubleshooting Procedures (Cont).
-
Section Iii. Direct Support Maintenance Procedures
-
Medical Lock (M/L) Outer Door Assembly
-
Figure 5-1. Medical Lock (M/L) Outer Door Assembly, Replace
-
Repair.
-
Figure 5-2. Medical Lock (M/L) Outer Door Assembly, Repair.
-
Medical Lock (M/L) Inner Door Assembly.
-
Figure 5-3. Medical Lock (M/L) Inner Door Assembly, Replace
-
Repair
-
Figure 5-4. Medical Lock (M/L) Inner Door Assembly, Repair
-
Pressure Relief Valve.
-
Figure 5-5. Pressure Relief Valve, Replace.
-
Ball Valve 3/4 Inch (Pressure Relief Valve Assembly)
-
Figure 5-6. Ball Valve 3/4 Inch, Replace
-
Repair.
-
Figure 5-7. Ball Valve 3/4 Inch, Repair
-
Skid Assembly, Chamber
-
Figure 5-8. Skid Assembly Chamber, Replace
-
Chamber Instrument Panel And Hood Assembly
-
Figure 5-9. Chamber Instrument Panel And Hood Assembly Enclosure, Replace
(Sheet 1 Of 2)
-
Replace.
-
Figure 5-9. Chamber Instrument Panel And Hood Assembly Enclosure, Replace
(Sheet 2 Of 2)
-
Heater/Chiller Unit (Ccu-03)
-
Figure 5-10. Heater/Chiller Unit (Ccu-03), Replace
-
Replace.
-
Heater/Chiller Unit Motor.
-
Figure 5-11. Heater/Chiller Unit Motor, Replace
-
Scrubber Assembly, Motor
-
Figure 5-12. Scrubber Assembly Motor, Replace
-
Portable Oxygen Analyzer Battery
-
Figure 5-13. Portable Oxygen Analyzer Battery, Replace
-
Portable Oxygen Analyzer Probe Assembly
-
Figure 5-14. Portable Oxygen Analyzer Probe Assembly, Replace.
-
Repair.
-
Figure 5-15. Portable Oxygen Analyzer Probe Assembly, Repair
-
Flow Meter.
-
Figure 5-16. Flow Meter, Replace
-
Replace
-
Double Light Power Supply (Inner Lock).
-
Figure 5-17. Double Light Power Supply (Inner Lock) Switch, Replace
-
Figure 5-18. Double Light Power Supply (Inner Lock) Indicator Light, Replace
-
Figure 5-19. Double Light Power Supply (Inner Lock) Variac Unit, Replace
-
Figure 5-20. Double Light Power Supply (Inner Lock) Transformer, Replace
-
Figure 5-21. Double Light Power Supply (Inner Lock) Power And Light Cords,
Replace.
-
Light Source.
-
Figure 5-22. Light Source, Repair
-
Repair.
-
Single Light Power Supply (Outer Lock).
-
Figure 5-23. Single Light Power Supply (Outer Lock) Switch, Replace.
-
Replace Indicator Light.
-
Figure 5-25. Single Light Power Supply (Outer Lock) Variac Unit, Replace
-
Figure 5-26. Single Light Power Supply (Outer Lock) Transformer, Replace
-
Figure 5-27. Single Light Power Supply (Outer Lock) Power And Light Cords,
Replace
-
Fluorescent Light
-
Figure 5-28. Fluorescent Light, Repair
-
Repair.
-
Wiring Harness.
-
Replace.
-
Figure 5-30. Wiring Harness, Replace (Sheet 1 Of 3).
-
Repair
-
Figure 5-30. Wiring Harness, Replace (Sheet 2 Of 3).
-
Figure 5-30. Wiring Harness, Replace (Sheet 3 Of 3).
-
Front Panel Chassis Assembly
-
Ofigure 5-31. Front Chassis Assembly, Replace
-
Figure 5-32. Front Panel Chassis Assembly Switch, Replace
-
Figure 5-33. Front Panel Chassis Assembly Potentiometer And Rheostat,
Replace
-
Figure 5-34. Front Panel Chassis Assembly Indicator Light, Replace
-
Figure 5-35. Front Panel Chassis Assembly Banana Jack, Replace
-
Figure 5-36. Front Panel Chassis Assembly Phone Jack, Replace
-
Figure 5-37. Front Panel Chassis Assembly Microphone Holder, Replace]
-
Replace Power Speaker Assembly
-
Figure 5-38. Front Panel Chassis Assembly Power Speaker Assembly, Replace
-
Circuit Card
-
Figure 5-39. Circuit Card, Replace
-
Battery Sense Card Assembly
-
Figure 5-40. Battery Sense Card Assembly, Replace
-
Battery Card And Case
-
Figure 5-41. Battery Card And Case, Replace
-
Figure 5-42. Battery Card And Case, Replace
-
Figure 5-43. Battery Card And Case Battery Contact P.C. Card, Replace.
-
Figure 5-44. Battery Card And Case Fuse Holder, Replace
-
Figure 5-45. Battery Card And Case Power Transformer, Replace
-
Replace Battery Charger P.C. Card Assembly
-
Figure 5-46. Battery Card And Case Battery Charger P. C. Card Assembly,
Replace
-
O2 "K" Bottles/Manifold.
-
Figure 5-47. O2 "K" Bottles/Manifold, Repair (Sheet 1 Of 2)
-
Repair
-
Figure 5-47. O2"K" Bottles/Manifold, Repair (Sheet 2 Of 2).
-
Gage (O2 "K" Bottles/Manifold)
-
Figure 5-48. Gage (O2 "K" Bottles/Manifold), Replace
-
Oxygen Pressure Gages.
-
Figure 5-49. Oxygen Pressure Gages, Replace
-
Replace.
-
Pressure Regulator.
-
Figure 5-50. Pressure Regulator, Replace
-
Replace.
-
Back Pressure Regulators.
-
Figure 5-51. Back Pressure Regulators, Replace
-
Replace.
-
Shutoff Valves (Oxygen)
-
Figure 5-52. Shutoff Valve (Oxygen), Replace.
-
Replace.
-
Isolator Valves.
-
Figure 5-53. Isolator Valves, Repair
-
Replace.
-
Dump Valves
-
Figure 5-54. Dump Valves And Silencers, Replace
-
Replace. (Cont)
-
Figure 5-55. Dump Valves, Repair
-
Oxygen Bibs Manifold
-
Figure 5-56. Oxygen Bibs Manifold, Replace
-
Inhalator Mask Assembly
-
Figure 5-57. Inhalator Mask Assembly, Repair.
-
Inhalator Mask Demand/Exhaust Regulators
-
Figure 5-58. Inhalator Mask Demand/Exhaust Regulators, Replace.
-
Dual Hose Assembly
-
Figure 5-59. Dual Hose Assembly, Replace
-
Repair.
-
Figure 5-60. Dual Hose Assembly, Repair
-
O2 And Air Piping
-
Figure 5-61. 02 And Air Piping, Removal (Sheet 1 Of 2)
-
Replace.
-
Figure 5-61. 02 And Air Piping, Removal (Sheet 2 Of 2).
-
Install.
-
Figure 5-62. 02 And Air Piping, Installation (Sheet 1 Of 2)
-
Install.
-
Figure 5-62. 02 And Air Piping, Installation (Sheet 2 Of 2)
-
Air Supply Manifold.
-
Figure 5-63. Air Supply Manifold, Replace
-
Replace
-
Ball Valves ¾ Inch (Air Supply Manifold)
-
Figure 5-64. Ball Valve 3/4 Inch, Replace
-
Repair.
-
Figure 5-65. Ball Valve 3/4 Inch, Repair
-
Repair. (Cont)
-
Ball Valves 1 Inch (Air Supply Manifold)
-
Figure 5-66. Ball Valve 1 Inch, Replace
-
Repair.
-
Figure 5-67. Ball Valve 1 Inch, Repair
-
Air Exhaust Manifold
-
Figure 5-68. Air Exhaust Manifold, Replace
-
Ball Valves 1 1/4 Inch (Air Exhaust Manifold).
-
Figure 5-69. Ball Valve 1 1/4 Inch, Replace
-
Repair.
-
Figure 5-70. Ball Valve 1 1/4 Inch, Repair
-
Depth Gages
-
Figure 5-71. Depth Gages, Replace
-
Replace
-
Caisson Gages
-
Figure 5-72. Caisson Gages, Replace
-
Chapter 6 General Support Maintenance Instructions
-
Section Ii. General Support Maintenance Procedures
-
Inner/Outer Lock Door Assembly
-
Figure 6-1. Inner/Outer Lock Door Assembly, Replace.
-
Inner/Outer Lock Door Assembly
-
Figure 6-2. Inner/Outer Lock Door Assembly, Repair
-
Medical Lock Assembly
-
Figure 6-3. Medical Lock Assembly, Repair
-
Calibration Of Gages And Valves
-
View Port Assembly
-
Figure 6-4. View Port Assembly, Replace
-
Repair.
-
Figure 6-5. View Port Assembly, Repair.
-
Shell Penetrators.
-
Figure 6-6. Electrical And Water Penetrator, Replace.
-
Replace Electrical And Water Penetrator.
-
Figure 6-7. Oxygen Penetrator, Replace
-
Replace Electrical/02 Penetrator
-
Figure 6-8. Electrical/O2 Penetrator, Replace
-
Replace Blank Penetrator.
-
Figure 6-9. Blank Penetrator, Replace.
-
Figure 6-10. Electrical And Water Penetrators, Repair.
-
Figure 6-11. Oxygen Penetrator, Repair.
-
Figure 6-12. Electrical/O2 Penetrator, Repair
-
Pressure Relief Valve
-
Figure 6-14. Pressure Relief Valve, Repair
-
Calibrate
-
Skid
-
Figure 6-15. Skid, Repair
-
Heater/Chiller Module
-
Figure 6-16. Heater/Chiller Module Flow Diagram
-
Figure 6-17. Heater/Chiller Module Electrical Schematic
-
Replacement Of Heating Element.
-
Figure 6-18. Heater/Chiller Module, Repair (Sheet 1 Of 3).
-
Figure 6-18. Heater/Chiller Module, Repair (Sheet 2 Of 3)
-
Figure 6-18. Heater/Chiller Module, Repair (Sheet 3 Of 3).
-
Condensing Unit Hermetic
-
Figure 6-19. Condensing Unit Hermetic, Replace.
-
Repair.
-
Figure 6-20. Condensing Unit Hermetic Fan Motor, Replace
-
Figure 6-21. Condensing Unit Hermetic Condenser, Replace
-
Figure 6-22. Condensing Unit Hermetic Receiver Tank, Replace.
-
Figure 6-23. Condensing Unit Hermetic Compressor, Replace.
-
Figure 6-24. Condensing Unit Hermetic Filter And Sight Glass Line, Replace
-
Low Pressure Control.
-
Figure 6-25. Low Pressure Control, Replace.
-
Replace.
-
Control Box Assembly.
-
Figure 6-26. Control Box, Replace
-
Control Box Assembly
-
Figure 6-27. Control Box Electrical, Schematic
-
Replace Toggle Switch.
-
Figure 6-28. Control Box, Repair
-
Replace Fuse Block
-
Shroud Assembly
-
Figure 6-29. Shroud Assembly, Replace
-
Pump Assembly
-
Figure 6-30. Pump Assembly, Replace
-
Repair.
-
Figure 6-31. Pump Assembly, Repair
-
High Temperature Control Unit
-
Figure 6-32. High Temperature Control Unit, Replace.
-
Repair.
-
Figure 6-33. High Temperature Control Unit, Repair
-
Low Temperature Control Unit
-
Figure 6-34. Low Temperature Control Unit, Replace
-
Repair.
-
Figure 6-35. Low Temperature Control Unit, Repair
-
Motor (Co2 Scrubber Assembly)
-
Figure 6-36. Motor, Repair (Sheet 1 Of 2)
-
Repair.
-
Figure 6-36. Motor, Repair (Sheet 2 Of 2)
-
Portable Oxygen Analyzer.
-
Figure 6-37. Portable Oxygen Analyzer, Repair (Sheet 1 Of 2)
-
Repair.
-
Figure 6-37. Portable Oxygen Analyzer, Repair (Sheet 2 Of 2)
-
Figure 6-38. Portable Oxygen Analyzer, Schematic
-
Pressure Regulator
-
Figure 6-39. Pressure Regulator, Repair
-
Repair.
-
Back Pressure Regulators
-
Figure 6-40. Back Pressure Regulators, Repair
-
Repair
-
Oxygen Shutoff Valve
-
Figure 6-41. Oxygen Shutoff Valve, Repair
-
Replace
-
Isolator Valve
-
Figure 6-42. Isolator Valve, Repair
-
Demand And Exhaust Regulators
-
Figure 6-43. Demand And Exhaust Regulators, Repair
-
Section Iii. Preparation For Storage Or Shipment
-
Government-Furnished Containers
-
Materiel Condition Tags
-
Appendix A References
-
Appendix A References (Cont)
-
Appendix B Maintenance Allocation Chart
-
Column Entries
-
Tool And Test Equipment Requirements (Sect. Iii And Iv)
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart
-
Section Ii. Maintenance Allocation Chart
-
Section Iv. Remarks
-
Appendix C Components Of End Item And Basic Issue Items Lists
-
Section Ii Components Of End Items
-
Section Ii Components Of End Items
-
Description
-
Section Iii. Basic Issue Items
-
Section Iii. Basic Issue Items (Cont)
-
Section Iii. Basic Issue Items (Cont)
-
Section Iii. Basic Issue Items (Cont)
-
Description
-
Description
-
Description
-
Appendix D Additional Authorization List
-
Section Ii. Additional Authorization List
-
Section Ii. Additional Authorization List
-
Section Ii. Additional Authorization List
-
Section Ii. Additional Authorization List
-
Section Ii. Additional Authorization List
-
Section Ii. Additional Authorization List
-
Appendix E Expendable/Durable Supplies And Materials List
-
Description
-
Description
-
Appendix F Torque Limits
-
Index
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
Index (Cont)
-
The Metric System And Equivalents
|