Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
CLEANING
Up
TM-9-2350-222-34-1 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-34-1
ENGINE REPLACEMENT (2D ENGINE) (Sheet 10 of 18)
INSTALLATION:
WARNING
Make sure powerplant is level and will not move.
1. Using engine and transmission sling and suitable hoist (engine weighs approximately 5,000 pounds), remove
replacement engine from container and place on two 10 x 10 x 12 inch wooden blocks. Position blocks under each
end of engine oil pan. Remove sling from engine.
NOTE
Remove shipping caps, plugs, covers, and mounts from replacement engine as
components are installed and install them on unserviceable engine.
2. Position new preformed packing (A) on transmission mounting flange (B).
Go on to Sheet 11
Change 3 3-27

Privacy Statement - Press Release - Copyright Information. - Contact Us