Click here to make tpub.com your Home Page

Page Title: TOP FRONT DOOR INSTALLATION PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
FRAME 1
Up
TM-9-2350-222-20-2-3-2 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
Schematic Drawing

TM 9-2350-222-20-2-3-2
TOP FRONT DOOR INSTALLATION PROCEDURE
19-5.
TOOLS: Cross tip screwdriver ( Phillips)
3/8 open end wrench
SUPPLIES: Screws, MS35207-264 (seven)
Nuts. MS21044-N3 (seven)
PERSONNEL: One
REFERENCES: TM 9-2350-222-10 for procedures to:
Traverse turret
Set turret traverse lock to LOCKED
EQUIPMENT LOCATION INFORMATION:
EQUIPMENT
FOLDOUT
CALLOUT
11
Driver's Master Control Panel
7
Turret Traverse Lock
9
Periscope Stowage Box
EQUIPMENT CONDITION: Driver's master control panel MASTER BATTERY switch set to OFF
I
FRAME 1
Step
Procedure
Traverse turret until periscope stowage box (1) can be reached from driver's compartment
1.
(TM-10).
2.
Set turret traverse lock to LOCKED (TM- 10).
3.
Place back side of door (2) against hinge (3) of periscope stowage box (1) and hold in
open position.
NOTE
Put in screws (4) with screw head inside periscope
stowage box (1).
4.
Using screwdriver and wrench, attach door (2) to hinge (3) of periscope stowage box (1)
with seven screws (4) and seven nuts (5).
Close door (2) of periscope stowage box (1).
5.
END OF TASK
Para 19-5
19-8

Privacy Statement - Press Release - Copyright Information. - Contact Us