Click here to make tpub.com your Home Page

Page Title: IR PERISCOPE SPARE HEAD STOWAGE BOX ASSEMBLY PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
IR PERISCOPE SPARE HEAD STOWAGE BOX DISASSEMBLY PROCEDURE
Up
TM-9-2350-222-20-2-3-2 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
CHAPTER 16. DRIVER'S NIGHT VIEWER STOWAGE BOX

TM 9-2350-222-20-2-3-2
15 -5.
IR PERISCOPE SPARE HEAD STOWAGE BOX ASSEMBLY PROCEDURE
Adhesive (item 4, App. A)
SUPPLIES:
Brush (item 5, App. A)
PERSONNEL: One
REFERENCES: JPG for procedure to use adhesives
GENERAL INSTRUCTIONS:
NOTE
Only parts that are being replaced should be installed.
FRAME 1
Step
Procedure
1.
Using brush and adhesive, install pad (1), pad (2), and pad (3) in box (4) as required
(JPG).
NOTE
Follow-on Maintenance Action Required:
Install IR periscope spare head stowage box ( para 15-
3).
END OF TASK
Para 15-5
15-6

Privacy Statement - Press Release - Copyright Information. - Contact Us