Click here to make tpub.com your Home Page

Page Title: FRAME 1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
IR PERISCOPE SPARE HEAD STOWAGE BOX INSTALLATION PROCEDURE
Up
TM-9-2350-222-20-2-3-2 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
IR PERISCOPE SPARE HEAD STOWAGE BOX DISASSEMBLY PROCEDURE

TM 9-2350-222-20-2-3-2
IR PERISCOPE SPARE HEAD STOWAGE BOX INSTALLATION PROCEDURE
15-3.
(CONT)
FRAME 1
Procedure
Step
1.
Traverse turret until periscope stowage box (1) can be reached from driver's compartment
(TM-10).
2.
Set turret traverse lock to LOCKED (TM- 10).
Open two latches (2) and open door (3).
3.
NOTE
Put in four screws (4) with screw head inside periscope
stowage box (1).
4.
Using screwdriver and wrench, attach IR periscope spare head stowage box (5) to
periscope stowage box (1) with four screws (4), `four lockwashers (6). four flat washers
(7), and four nuts (8). Torque four nuts (8) to between 48 and 60 inch-pounds.
5.
Close door (3) of stowage box (1).
END OF TASK
Para 15-3 Cont
15-4

Privacy Statement - Press Release - Copyright Information. - Contact Us