Click here to make tpub.com your Home Page

Page Title: CHAPTER 3. CHECKOUT, ALIGNMENT, AND ADJUSTMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
WAR TIME PREVENTIVE MAINTENANCE
Up
TM-9-2350-222-20-2-1 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
TURRET CHECKOUT (CONT)

TM 9-2350-222-20-2-1
CHAPTER 3
CHECKOUT, ALIGNMENT, AND ADJUSTMENT
SECTION 1: CHECKOUT PROCEDURES
3-1.
CHECKOUT PROCEDURES INDEX
Para
Task
Page
Turret Checkout
Winch and Boom Checkout
Synchronization and Backlash Check of 165-MM
Gun with Gunner's Periscope M32C/M32CEl -
Ramp Method
Parallax Check of Gunner's Periscope M32C/M32CEl
Grenade Launcher Checkout Procedure
3-2.
TURRET CHECKOUT
TEST EQUIPMENT Gunner's Quadrant M1A1
PERSONNEL: Two
REFERENCES:
TM 9-2350-222-10 for procedures to:
Operate turret lighting
operate instrument lighting
o p e r a t e armament
Traverse turret and elevate/depress gun in manual and power modes
TM 9-2350222-20-2-3 for procedure to check nitrogen precharge pressure
TM 9-1290-200-14&P for procedure to calibrate Gunner's Quadrant M1A1
EQUIPMENT CONDITION:
Tank intact and no condition exists that could cause equipment damage
when turret is operated (DA Form 2404 checked). Tank parked on level
ground in an area where traversing turret or elevating/depressing gun
will not be a possible danger to personnel or cause damage to other
equipment.
GENERAL INSTRUCTIONS:
Make sure all armament is unloaded before doing turret
checkout
Before elevating gun or traversing turret, make sure that
adjacent area, both inside and outside tank are clear of
obstacles and operation will not be hazardous to person-
nel.
Para 3-1
Change 1 3-1

Privacy Statement - Press Release - Copyright Information. - Contact Us