Click here to make tpub.com your Home Page

Page Title: FRAME 3
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
FRAME 2
Up
TM-9-2350-222-20-2-1 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
FRAME 4

TM 9-2350-222-20-2-1
2-5.
M19 CUPOLA SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE (CONT)
Reference
Procedure
Item to be Inspected
Step
Check plunger assembly (1)
d.
Azimuth Lock
1.
for crossed or damaged
Assembly (cent)
threads. Replace if required.
Check housing (2) and cam
e.
assembly (3) for cracks or
breaks. Replace if required.
Check pins (4) and (5) for
f.
damage. Replace if required.
Replace cotter pin (6).
g.
Make sure spring (7) is not
h.
cracked or damaged. Replace
if required.
GO TO FRAME 4
Para 2-5 Cont
2-13
Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us