Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
M19 CUPOLA SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE
Up
TM-9-2350-222-20-2-1 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
FRAME 3

TM 9-2350-222-20-2-1
2-5.
M19 CUPOLA SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE (CONT)
FRAME 2
ITEM TO BE INSPECTED
STEP
PROCEDURE
REFERENCE
Cupola Access Door (On Cradle)
1.
Lubricate all hinges and latches.
Terminal Board Assembly (Cupola a. Remove and disassemble terminal
2
Notify support mainte-
Slip Ring)
nance
b. Check terminal board strips (A),
contact boards (C) and springs (B)
for wear, dirt, grease, foreign mat-
ter, corrosion and electrical burn
marks. If strips (A) or springs (B)
are dirty, clean with cleaning sol-
vent PD-680.
slowly traverse cupola until
terminal board stripe (A) just
begin to engage left and right
contact board springs (C).
3.
Azimuth Lock Assembly
a. Remove and disassemble the azi-
TM 20-2-3 (para 36-66, 36-
muth lock assembly.
68)
b. Clean all component of the azi-
muth lock assembly with a cloth or
sponge soaked in drycleaning sol-
vent.
c. Wipe all parts dry with a clean
GO TO FRAME 3
Para 2-5 Cont
2-12
Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us