Click here to make tpub.com your Home Page

Page Title: M19 CUPOLA SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
M150 COMBINATION GUN MOUNT SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE
Up
TM-9-2350-222-20-2-1 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
FRAME 2

TM 9-2350-222-20-2-1
2-5.
M19 CUPOLA SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE
9/16 in. socket head screw key (Allen wrench)
TOOLS:
9/16 in. hex bit
9/16 in. socket (3/4 in. drive)
Torque wrench (3/4 in. drive)
SUPPLIES:
Clean lint-free cloth
Drycleaning solvent
Grease (automotive and artillery)
Lubricating oil
PERSONNEL One
TM 9-2350-222-10 for procedure to:
REFERENCES
operate hatch
Adjust azimuth lock assembly
Traverse cupola
TM 9-2350-222-20-2-3 for procedures to:
Remove, disassemble, assemble and install azimuth lock assembly
LO 9-2350-222-12 for lubricating instructions
FRAME 1
REFERENCE
PROCEDURE
ITEM TO BE INSPECTED
STEP
Clear weapon before
beginning inspection.
Lubricate lock with grease
1.
Hatch Assembly
Lubricate moving parts.
Commander's Seat
GO TO FRAME 2
Para 2-5
2-11
Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us