| ||||||||||
|
|
![]() ![]() TM 9-2350-222-20-2-1
SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE (CONT)
2-2.
Winch and Boom (Cont)
b.
Reference
Procedure
Item to be Inspected
TM 20-2-3
Remove and service cable.
a.
Winch Cable and
1.
(para 62-2, 62-3)
Drum
Check entire length of cable
b.
for loose strands, kinks, cuts,
or broken wire. Replace
entire cable if damage is
evident.
Grease trunnion with GAA.
LO 9-2350-222-1
Boom Trunnion
2.
Fittings
TM 20-2-3
a.
Check cable for loose
Stayline Clevis Pins
3.
strands, kinks, cuts, or
(para 62-4, 62-5)
and Cables
broken wire. Replace
cable if damage is
evident.
b.
Check clevis pins for
missing cotter pins.
c.
Clean cables with dry
cleaning solvent and coat
with corrosion cleaning
compound.
a.
Check sheave and shaft
TM 20-2-3
Sheave
4.
for damage. Replace
(para 66-2, 66-3)
sheave or shaft if
damaged.
Check sheave for any
b.
missing cotter pins.
Turn sheave to check
c.
freedom of movement.
Clean and lubricate with
grease as required.
GO TO FRAME 3
Para 2-2 Cont
Change
3
2-7
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |