Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE (CONT)
Up
TM-9-2350-222-20-2-1 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
FRAME 3

TM 9-2350-222-20-2-1
SEMIANNUAL (180 DAY) PREVENTIVE MAINTENANCE (CONT)
2-2.
a.
Turret (Cont)
FRAME 2
Step
Procedure
Reference
Item to be Inspected
1.
Main Accumulator
Check main accumulator for
TM 20-2-3
proper nitrogen pressure.
(para 1-18, 1-19)
Recharge pressure using
accumulator charging device or
reduce pressure as required.
Add oil if necessary.
Check manual elevation
2.
Manual Elevation
TM 20-2-3
accumulator for proper
Accumulator
(para 1-20)
nitrogen pressure. Recharge
pressure using accumulator
charging device or reduce
pressure as required. Add oil
if necessary.
GO TO FRAME 3
Para 2-2 Cont
Change 3
2-3

Privacy Statement - Press Release - Copyright Information. - Contact Us