Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
CLEANING AND INSPECTION
Up
TM-9-2350-222-20-1-5 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
FRONT FENDERS, HEADLIGHT GUARDS, AND OUTRIGGERS REPLACEMENT (Sheet 1 of 7)

TM 9-2350-222-20-1-5
OUTRIGGER SUPPORT NO. 4 (LEFT AND RIGHT) REPLACEMENT (Sheet 4 of 4)
3.
Install extension bracket (E) to outrigger (A).
4.
Using 9/16 inch socket, secure extension
bracket (E) to outrigger (A) with two
screws (F).
4.1. Apply locking compound (Item 15, Appen-
dix D) to threads of screw (G).
5.
Using 9/16 inch socket, secure extension
bracket (E) to bottom flange outrigger (A)
with screw (G) and flat washer (H). Using
torque wrench and 9/16 inch socket, tighten
screw (G) 22-30 lb-ft (33-40 N·m).
Install air cleaner (side loading, page 7-90, or top loading, page 7-97).
6.
Install fender extension (page 16-74).
7.
Install rear fender stowage box (page 16-186).
8.
End of Task
TA25357
16-64

Privacy Statement - Press Release - Copyright Information. - Contact Us