Click here to make tpub.com your Home Page

Page Title: INSTALLATION-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION
Up
TM-9-2350-222-20-1-5 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-20-1-5
TURRET INFLATABLE SEAL MANIFOLD, GAGE, AND RELATED PARTS REPLACEMENT (Sheet
7 of 10)
10.
Remove assembled gage (J), manifold (A), check
valve (D), and attached components from vise.
Position assembled gage (J), manifold (A), check
11.
valve (D), and attached components as a unit to
bracket (K).
12.
Using 7/16 inch wrench, install two screws and
lockwashers (L) to secure manifold (A) to
bracket (K).
13. Install clamp (M) onto hose (N).
14. Install hose (N) onto connector (F) and slide
clamp (M) over hose and connector.
15. Using screwdriver, tighten clamp (M).
Go on to Sheet 8
TA140663
16-51

Privacy Statement - Press Release - Copyright Information. - Contact Us