Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
REMOVAL-continued
Up
TM-9-2350-222-20-1-5 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
INSTALLATION-continued

TM 9-2350-222-20-1-5
TURRET INFLATABLE SEAL MANIFOLD, GAGE, AND RELATED PARTS REPLACEMENT (Sheet
6 of 10)
INSTALLATION:
1.
Install manifold (A) in vise.
2.
Using 9/16 inch wrench, install adapter (B) into
manifold (A).
3.
Install new preformed packing (C) onto adapter
(B).
NOTE
Install check valve (D) with arrow
pointing toward manifold (A).
4.
Using 1-1/16 inch wrench, install and tighten
check valve (D) onto adapter (B).
5.
Install preformed packing (E) onto connector
(F).
6.
Using 9/16 inch wrench, install connector (F) with preformed packing (E) into check valve (D).
7.
Using 7/16 inch wrench, install elbow (G) into manifold (A).
Using 7/16 inch wrench, install drain cock (H) into manifold (A).
8.
NOTE
Position pressure gage (J) indicator face to face with drain cock (H).
9.
Install pressure gage (J) into manifold (A) and tighten with 9/16 inch wrench.
Go on to Sheet 7
TA140662

Privacy Statement - Press Release - Copyright Information. - Contact Us